The first stage of a construction, is
(A) Preparation of estimate
(B) Survey of the site
(C) Initiation of proposal
(D) Preparation of tender

1 Answer

Answer :

(C) Initiation of proposal

Related questions

Description : While filling the tender for any work, the contractor considers (A) Site survey (B) Availability of construction materials (C) Availability of labour (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies (B) ... and the proportions of materials to be used for a particular item (D) All the above

Last Answer : (D) All the above

Description : The stage in problem solving that includes the preparation of suitable hypothesis for investigation. (a) Survey (b) Planning for action (c) Problem description (d) Discussion

Last Answer : (b) Planning for action

Description : For preparation of a contour plan for a route survey  (A) Method of squares is used  (B) Method of trace contour is used  (C) Method of cross profile is used  (D) Indirect method of contouring is used 

Last Answer : (C) Method of cross profile is used 

Description : construction site preparation?

Last Answer : form_title=construction site preparation form_header=7173 "Which, of the following, needs to be removed from the site? (Check all that apply)"*= [] Trees [] Tree Stumps [] Fences [] Buildings [] Other ... this site?*= () Prepare for building () Landscaping () Prepare for appraisal or sale () Other

Description : For the construction of buildings, the subheads of the estimate are (A) Earthwork, Concrete work, Brick work (B) Brickwork, Stone work, Roofing (C) Brickwork Flooring, Wood work, Steel work (D) All the above

Last Answer : (D) All the above

Description : During which step of cellular carcinogenesis do cellular changes exhibit increased malignant behavior? a) Progression During this third step, cells show a propensity to invade adjacent tissues and ... of cellular DNA. d) Prolongation No stage of cellular carcinogenesis is termed prolongation.

Last Answer : a) Progression During this third step, cells show a propensity to invade adjacent tissues and metastasize.

Description : Which stage marks the beginning of the project? a ) Initiation b) Planning c) Deciding on a project d) Closing out the previous project.

Last Answer : Initiation

Description : Among the critical stages, the most critical stage of wheat crop for irrigation is—(A) CRI–Crown Root Initiation stage (B) Tillering stage (C) Jointing stage (D) Flowering stage

Last Answer : (A) CRI–Crown Root Initiation stage

Description : In Wheat Crown root initiation stage comes —- days after sowing a. 21 b. 11 c. 31 d. 41

Last Answer : a. 21

Description : In which crop crown root initiation is critical growth stage for irrigation? a. Maize b. Rice c. Sugarcane d. Wheat

Last Answer : d. Wheat

Description : Most critical stage for N requirement of soyabean is a. Bud initiation b. Flowering c. Pod maturity d. Branching stage

Last Answer : b. Flowering

Description : In which crop crown root initiation is critical growth stage for irrigation? a. Maize b. Rice c. Sugarcane d. Wheat

Last Answer : d. Wheat

Description : Most critical stage for N requirement of soyabean is a. Bud initiation b. Flowering c. Pod maturity d. Branching stage

Last Answer : b. Flowering

Description : The first stage of deciding the alignment of a hill road, is (A) Reconnaissance (B) Detailed survey (C) Trace-out (D) Preliminary survey

Last Answer : Answer: Option A

Description : Who prepared the first estimate of National Income for the country? (1) Central Statistical Organisation (2) National Income Committee (3) Dadabhai Naoroji (4) National Sample Survey Organisation

Last Answer : (3) Dadabhai Naoroji Explanation: Dadabhai Naoroji prepared the first estimates of National income in 1876. He estimated the national income by first estimating the value of agricultural production ... nonagricultural production. However, such method can only been called as a non-scientific method.

Description : Who prepared the first estimate of National Income for the country ? (1) Central Statistical Organisation (2) National Income Committee (3) Dadabhai Naoroji (4) National Sample Survey Organisation 

Last Answer : Dadabhai Naoroji

Description : How to estimate the cost of home construction?

Last Answer : That is a very broad question and the answer would depend on where you live and the cost of materials in your area. it is hard to tell if the contractor will charge by the square foot or by ... calculate this by the square foot and it can help you to determine the cost of building in your area.

Description : The initiation site for transcription is recognized by (A) α−Subunit of DNA-dependent RNA polymerase (B) β−Subunit of DNA-dependent RNA polymerase (C) Sigma factor (D) Rho factor

Last Answer : Answer : C

Description : In the process of transcription in bacterial cells (A) Initiation requires rho protein (B) RNA polymerase incorporates methylated bases in correct sequence (C) Both the sigma unit and core ... RNA polymerase are required for accurate promotor site binding (D) Primase is necessary for initiation

Last Answer : Answer : C

Description : Which binding is inhibited by pactamycin? A- Aminoacyl-tRNA to the A-site of 30S subunit B- Initiator-tRNA to 30S/40S initiation complexes C- Peptidyl t-RNA to the 50S subunit D- Formation of peptide bond in P site

Last Answer : Initiator-tRNA to 30S/40S initiation complexes

Description : It is often difficult to estimate size at an early stage in a project  when only a specification is available a) True b) False

Last Answer : a) True

Description : An impression with elastomer in custom tray has been taken for crown preparation; it will be two days before the impression gets to the laboratory for construction of the crown. Which impression ... A. Polyether B. Thiokol or meraptan rubber C. Condensation silicone D. Vinyl polysiloxane

Last Answer : D. Vinyl polysiloxane

Description : ------------- gives a diagnosis of the profitability and financial position a) Analysis of financial statements b) Preparation of financial statements c) Construction of statements d) None of the above

Last Answer : a) Analysis of financial statements

Description : Describe the preparation stage of Cristiano Ronaldo. 

Last Answer : Ans. Cristiano Ronaldo used to practice daily from morning to night. Ronaldo had to go away from his family for better training. He was depressed and home sick. He used to call home and cry ... in improving his game. Cristiano Ronaldo got selected for Portugal's most famous club "Sporting Lisbon". 

Description : If a contractor proposes to increase concrete cover beyond contractual specification (i.e. 40mm to 70mm), shall engineers accept the proposal?

Last Answer : In contractual aspect, based on the requirement of General Specification of Civil Engineering Works (1992 Edition), the tolerance of concrete cover is between + ... larger cover. Therefore, with an increase of concrete cover, the crack width will increase which is undesirable.

Description : Survey of the major projects is done by (a) Chief Engineer (b) Chief Administrative Officer (CAO) construction* (c) Divisional Railway Manager (d) Railway Board

Last Answer : (b) Chief Administrative Officer (CAO) construction*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : Before constructing a dam, the factor to be considered for controlling sedimentation, is (A) Selection of dam site (B) Construction of check dams (C) Providing vegetation screens (D) All the above

Last Answer : (D) All the above

Description : Mobilization advance up to 10% of the cost of work is given to a contractor (A) On commencement of work at site for payment of loan taken by him (B) For the purchase of construction ... staff (D) For all activities required to start the work at site on finalization of the contract document

Last Answer : (D) For all activities required to start the work at site on finalization of the contract document

Description : Site order book is used for recording (A) Instructions by the executive engineers (B) Construction measurements (C) Issue of store equipments (D) Names of the casual labour

Last Answer : (A) Instructions by the executive engineers

Description : A golden rule for the procurement of construction stones, suggests (A) 100% at the site (B) 67% at the site and 33% under procurement (C) 50% at the site and 50% under procurement (D) 33% at the site and 67% under procurement

Last Answer : (B) 67% at the site and 33% under procurement

Description : Is there a web site or service that can estimate value of things? (details)

Last Answer : I recently went through all of my father’s things after he died and found that looking for things on ebay would give me an idea of how much they were worth…you might try there.

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements

Description : After deciding to order replacement parts for aging machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier search

Description : After deciding to order replacement parts for aging machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier

Description : After deciding to order replacement parts for ageing machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier search

Description : Explain construction and working of two stage reciprocating air compressors.

Last Answer : Figure: Two Stage Reciprocating air compressor Construction and Working : It consists of two cylinders (L.P. and H.P.) with water cooled intercooler and air receiver. First of all fresh air is ... (ie second stage) from 3 to 4 is delivered by the compressor at pressure P3 & Temp T4.

Description : What is the role of an occupier of a major accident hazard installation in preparation of off-site emergency plan?

Last Answer : An occupier of a major accident hazard installation has to provide such information relating to industrial activity under his control to the concerned authority i.e. the District Emergency Authority/ ... required including the nature, extent and likely effects of site of possible major accident. 

Description : If P is population of a city in thousands and Q is fire demand in litres per minute, for proper  estimate of water, the Empirical formula Q = 1135 [(P/5) + 10] is suggested by  (A) National Board of fire under-writers  (B) Freeman  (C) Kuichling  (D) None of these 

Last Answer : (B) Freeman 

Description : Most satisfactory formula for an estimate of fire demand Q for a city of population P in thousands  for Indian conditions, is  (A) Q = 1115 (p/5 + 20)  (B) Q = 1640 P (1 - 0.01 P)  (C) Q = 3180 P (D) None of these 

Last Answer : (C) Q = 3180 P

Description : For initial estimate for a beam design, the width is assumed (A) 1/15th of span (B) 1/20th of span (C) 1/25th of span (D) 1/30th of span

Last Answer : Answer: Option D

Description : Ryve's formula for flood estimate in cumecs, is (A) Q = CA3/4 (B) Q = CA2/3 (C) Q = CA1/2 (D) Q = CA1/4

Last Answer : Answer: Option B

Description : In the estimate of design flood, Dickens assumes that high flood in cumecs, is proportional to catchment area raised to the power (A) 1/4 (B) 1/2 (C) 3/4 (D) 2/3

Last Answer : Answer: Option C

Description : For the estimate of high floods in fan-shaped catchment, the formula used is (A) Dicken's formula (B) Ryve's formula (C) Inglis formula (D) None of these

Last Answer : Answer: Option C

Description : Which of the following methods is used to estimate flood discharge based on high water marks left over in the past? (A) Slope-area method (B) Area-velocity method (C) Moving boat method (D) Ultrasonic method

Last Answer : Answer: Option A

Description : Pick up the item of work not included in the plinth area estimate (A) Wall thickness (B) Room area (C) W.C. area (D) Courtyard are

Last Answer : (D) Courtyard area

Description : The most reliable estimate is (A) Detailed estimate (B) Preliminary estimate (C) Plinth area estimate (D) Cube rate estimate

Last Answer : (A) Detailed estimate

Description : While preparing a detailed estimate (A) Dimension should be measured correct to 0.01 m (B) Area should be measured correct to 0.01 sqm (C) Volume should be measured correct to 0.01 cum (D) All the above

Last Answer : (D) All the above