In a semi permanent (BG) diversion the gradient should not be steeper then  (a) 1 in 75
(b) 1 in 125
(c) 1 in 100*
(d) 1 in 150

1 Answer

Answer :

(c) 1 in 100*

Related questions

Description : In a semi permanent (BG) diversion the gradient should not be steeper then (a) 1 in 75 (b) 1 in 125 (c) 1 in 100 * (d) 1 in 150

Last Answer : (c) 1 in 100 *

Description : Min. sleeper density in case of semi permanent diversion- (a) (m + 2) (b) (m + 3)* (c) (m + 4) (d) ( m + 7 )

Last Answer : (b) (m + 3)*

Description : The ruling gradient is 1 in 200 on a section of the BG track. If the track is laid in that place at a curve of 5 degrees then the allowable ruling gradient on the curve will be a) 1 in 16.7 b) 1 and 400 c) 1 in 240 d) 1 in 333*

Last Answer : d) 1 in 333*

Description : Permissible creep in track is m. 50 mm n. 100 mm o. 125 mm p. 150 mm.*

Last Answer : p. 150 mm.*

Description : The horizontal clearance between guard rail and running rail in BG track is a) 25 mm b) 250 ± 50 mm* c) 75 mm d) 200 ± 50 mm

Last Answer : b) 250 ± 50 mm*

Description : To compensate the loss of tractive force of vehicles along curves of radius R, the percentage reduction of gradient, is (A) 50/R (B) 75/R (C) 100/R (D) 125/R

Last Answer : Answer: Option B

Description : Temporary arrangements for rebuilding of Railway bridges can be executed by providing a) Temporary girder b) Temporary diversion c) Any of the above* d) None of the above

Last Answer : c) Any of the above*

Description : The total sulphur content of the body is (A) 25–50 gm (B) 50–75 gm (C) 100–125 gm (D) 150–200 gm

Last Answer : Answer : D

Description : Seed-rate for timely sown wheat is— (A) 75 kg/ha (B) 100 kg/ha(C) 125 kg/ha (D) 150 kg/ha

Last Answer : (C) 125 kg/ha

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : Gauge conversion means: (a) Converting MG to BG (b) Converting NG to MG (c) Converting NG to BG (d) Converting MG/NG to BG*

Last Answer : (d) Converting MG/NG to BG*

Description : Number of Elastic clips used for one K to BG single line section having 13 length & concrete sleepers of M+7 sleeper density are (a) 5280 (b) 6160* (c) 6250 (d) 6500

Last Answer : (b) 6160*

Description : Number of sleepers required having sleeper density of M+7 for one Km of BG single line is (a) 1360 (b) 1540* (c) 1660 (d) None of the above

Last Answer : (b) 1540*

Description : The number of standard rails (13 m) for one km. BG section single line section is (a) 120 (b) 154* (c) 168 (d) 196

Last Answer : (b) 154*

Description : The recommended width of Single line formation cutting for BG excluding drain is a) 6250 mm* b) 6850mm c) 54 90mm d) 6100mm

Last Answer : a) 6250 mm*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : The minimum and maximum clearances of check rails at all BG level crossings shall be a) 51 to 57 mm* b) 44 to 48 mm c) 41 to 45 mm d) 55 to 70 mm

Last Answer : a) 51 to 57 mm*

Description : Minimum distance of duty hut from centre line of nearest track on BG is a) 2 meters b) 3 meters c) 4 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : Minimum distance of gate post from centre line of nearest track on BG is a) 2 meters b) 3 meters* c) 4 meters d) 5 meters

Last Answer : b) 3 meters*

Description : For protection of level crossing gate in an emergency on BG double line the Gateman should place one detonator at one place and 3 detonators at a subsequent place at a distance of ------- a) and------ ... c) 500 meters and 1000 meters d) 600 meters and 1200 meters* e) 800 meters in 1500 meters

Last Answer : d) 600 meters and 1200 meters*

Description : Indication post for detonator should be provided at a distance of ---------meter and --------- meter for BG level crossing a) 400 meters in 800 meters b) 500 meters and 1200 meters c) 600 meters and 1200 meter * d)600 meters and 1000 meters

Last Answer : c) 600 meters and 1200 meter *

Description : The clear distance between consecutive sleepers laid over unballasted bridge on BG should not exceed a)300mm b)400mm c)450mm* d)550mm

Last Answer : c)450mm*

Description : Length of bridge timber in BG a) outer to outer of girder plus 305mm b) 2440mm c) whichever is more in a) & b)* d) whichever is less in a) & b)

Last Answer : c) whichever is more in a) & b)*

Description : Minimum length of steel channel sleeper in BG a) 2500mm b) 2440mm* c) 2400mm d) 2600mm

Last Answer : b) 2440mm*

Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm

Last Answer : a) 450 mm*

Description : In a temporary signaling arrangements for a bridge work in BG section, speed board shall be placed in advance of 30 m from the a) C.L. of the bridge b) Termination Board c) Start of the bridge/work spot* d) Caution Board

Last Answer : c) Start of the bridge/work spot*

Description : .In a temporary signaling arrangements for a bridge work in BG section, caution board shall be placed in advance of ……. m from start of the bridge/ work spot. a) 30 m b) 1200 m* c) 677 m d) 1000 m

Last Answer : b) 1200 m*

Description : For A Class, the gross clearance of over maximum moving dimension for BG is (a) 100mm (b) 125mm (c) 150mm* (d) 175mm

Last Answer : (c) 150mm*

Description : Maximum width of rolling stock on BG should be (a) 4745mm (b) 3250mm* (c) 3450mm (d) 4140mm

Last Answer : (b) 3250mm*

Description : Maximum height of rolling stock on BG should be (a) 2745mm (b) 3250mm (c) 3450mm (d) 4140mm*

Last Answer : (d) 4140mm*

Description : What is maximum height above rail level for low-level passenger platform for BG? (a) 300mm (b) 455mm* (c) 525mm (d) 550mm

Last Answer : (b) 455mm

Description : Minimum depth of ballast cushion below the bottom of sleeper at the rail seat on BG group A route should be :- (a) 350 mm. (b) 250 mm. (c) 300 mm.* (d) 325 mm.

Last Answer : (c) 300 mm.*

Description : What do you mean by BG a. Big Gauge b. Broad Gauge* c. Buffer gauge d. None of above

Last Answer : b. Broad Gauge*

Description : The train runs faster on BG than on MG rail because its speed is directly proportional to a) Weight of the train* b) Gauge width c)Policy of Railway Board d) Length of the train

Last Answer : a) Weight of the train*

Description : Longest platform of the world on BG is a) At Sonepur station* b) At Sasaram station c) At Allahabad station d) At Kharagpur station

Last Answer : a) At Sonepur station*

Description : The gradients of trace cuts for hilly roads, are kept (A) Equal to ruling gradient (B) 10 to 20 per cent easier than ruling gradients (C) 10 to 20 per cent steeper than ruling gradients (D) None of these

Last Answer : Answer: Option B

Description : A sewer is laid from a manhole to a manhole , 250 m away along a gradient of 1 in 125. If the  reduced level of the invert at is 205.75 m and the height of the boning rod is 3 m, the reduced  level of the sight rail at , is  (A) 208.75 m  (B) 202.75 m  (C) 206.75 m  (D) 211.75 m

Last Answer : (C) 206.75 m 

Description : Callendar Hamilton spans are normally available maximum up to a) 60 ft. b) 100 ft. c) 150 ft. d) 200 ft.*

Last Answer : d) 200 ft.*

Description : Maximum tilt specified during sinking of well foundation is a) 1 in 10 b) 1 in 50 c) 1 in 100* d) 1 in 150

Last Answer : c) 1 in 100*

Description : Frequency of TTM tamping on PSC sleepers track a. 2 years or 100 GMT which ever is earlier* b. 2 years or 150 GMT which ever is earlier c. 1.5 years or 200 GMT which ever is earlier d. 2 years or 175 GMT which ever is earlier

Last Answer : a. 2 years or 100 GMT which ever is earlier*

Description : For Wages, the negotiation Starting Position cannot be less than ____% or more than ____% of the current contract. a. 75; 125 b. 75; 150 c. 80; 125 d. 80; 150

Last Answer : d. 80; 150

Description : A solid shaft has diameter 80 mm. It is subjected to a torque of 4 KNm. The maximum shear stress induced in the shaft would be (a) 75/p N/mm2 (b) 250/p N/mm2 (c) 125/p N/mm2 (d) 150/p N/mm2

Last Answer : (c) 125/p N/mm2

Description : he minimum compressive strength of first class brick should be a) 75 kg per centimeter square b) 90 kg per centimeter square c) 100 kg per centimeter square* d) 120 kg per centimeter square

Last Answer : c) 100 kg per centimeter square*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : Self cleaning velocity of a sewer line depends upon (a) Diameter of sewer (b) Gradient of ewer line (c) Type of sewerage (d) All of them*

Last Answer : d) All of them*

Description : Piping in a soil mass is a) Erosion of subsoil by the high velocities of flow of water through it when such velocities exceed a certain limit* b) Caused due to very low exit gradient c) ... connected pores d) Due to loss of the strength of cohesion less soil because of upward flow of of water

Last Answer : a) Erosion of subsoil by the high velocities of flow of water through it when such velocities exceed a certain limit*

Description : The height of formation depends upon the a) Ground contours and the gradient adopted* b) Ground contour only c) Gradient adopted only d) Rainfall intensity over the year

Last Answer : a) Ground contours and the gradient adopted*

Description : The catch water drains are provided in the a) Formation in the embankment b) Formation in cutting* c) Zero fills formation d) Steep gradient

Last Answer : b) Formation in cutting*