t is permissible to allow trainee welder to carry out production welding?  
a) Never
b) Yes as long as the supervisor is happy with his workmanship standard  
c) Yes as long as he has the approved qualification to cover the intended scope of work  
d) Yes as long as no NDT is required on the finished weld

1 Answer

Answer :

a) Never

Related questions

Description : Who should select the specific welds for NDT, to cover the 10% contractual percentage required by the specification/Code? a) Anyone can select the welds as its just a random choice b) The welder ... welding is always carried out to a high standard the use of percentage NDT is of no real value

Last Answer : c) This will be referenced in the inspection and test plan

Description : What course of action should be taken upon finding a welder using incorrect shielding gas? a) Allow welding to proceed if the workmanship is good b) Report the incident and record all relevant ... the same as the approved one d) Change the electrode for the correct type and continue welding

Last Answer : b) Report the incident and record all relevant information

Description : Who determines what the correct weld preparation (root gap, root face, included angle) should be? a) The welding engineer b) The welding supervisor c) The welder will decide d) The inspector will recommend what is suitable

Last Answer : a) The welding engineer

Description : Which of the following would not be required to be checked before welding? a) The welding consumables b) The welder qualification c) Calibration of the welding equipment d) The workshop humidity

Last Answer : d) The workshop humidity

Description : Weather date of welding is marked on weld? (i) Yes (ii) As decided by the site supervisor (iii) No* (iv) None of the above

Last Answer : (iii) No*

Description : Why is it essential to clean the excess weld metal on completion of the production weld? a) So it can be ready for painting b) To remove any rust c) To ensure it is suitably clean for visual inspection and NDT d) To remove slag from the undercut

Last Answer : c) To ensure it is suitably clean for visual inspection and NDT

Description : Who is responsible for site safety? a) Site Quality Engineer b) Welding Supervisor c) An approved safety engineer d) Everyone

Last Answer : d) Everyone

Description : welding i want to weld steel bars to my trailer should i use a arch welder or a wire feed welder?

Last Answer : arch welding is a more stable form of welding. it get hotter and creates a stronger bond

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : In welder qualification testing of 45mm plates, why are side bends used instead of root and face bends? a) They are easier to produce b) The testing equipment cannot handle thick root/face bends c) Root defects are not important for welder qualification d) They give more accurate indications

Last Answer : d) They give more accurate indications

Description : Who should have access to the WPQR’S? a) NDT operators b) Inspectors only c) Welders only d) Welding Engineer

Last Answer : d) Welding Engineer

Description : Who has the final responsibility of sentencing and accepting a weld on completion? a) The contractor’s inspector b) Site manager c) The welder d) The client’s inspector or certifying authority

Last Answer : d) The client’s inspector or certifying authority

Description : Is it permissible to install tapped holes in fittings per ASME B16.5 a) No. b) Yes. c) Yes, if the metal is thick enough to allow the required thread length. d) Yes, as permitted by ASME B16.20.

Last Answer : c) Yes, if the metal is thick enough to allow the required thread length.

Description : What information should be recorded as a minimum, on a completed production weld? a) Size and type of electrode and b) Welding supervisor’s name c) Welder’s Identification, date and weld number d) Welding inspectors name

Last Answer : c) Welder’s Identification, date and weld number

Description : What does the term WPQR means? a) Weld productivity quality review b) Weld production quality requirments c) Welding procedure

Last Answer : c) Welding procedure

Description : Who has the responsibility of ensuring the welder is using the correct polarity during welding? a) The welder and the welding inspector b) Store man and the welder c) Welding Engineer d) The Q/A department

Last Answer : a) The welder and the welding inspector

Description : The welders have increased the voltage on the SAW welding set, what would be the effect on the weld appearance? a) No effect b) The weld width would be narrower c) The penetration will be increased d) The weld width would be wider

Last Answer : d) The weld width would be wider

Description : Ishan, a trainee in a multinational bank has just got his first official computer with internet facility in his office. -Technology

Last Answer : Malware is a computer software which is specifically designed with malicious intention generally to disrupt, damage, or gain authorized access to a computer system. It can be of various ... of Antivirus software and regular PC scanDo not click on unknown or suspicious linksAvoid pirated software

Description : New AT weld should be entered in TMS by ? (i) Sectional JE/SSE* (ii) Incharge SSE (iii) Welder (iv) None of the above

Last Answer : (i) Sectional JE/SSE*

Description : When MMA welding what will be the effect on the weld f the power source was changed from AC to DC-ve? a) None b) Higher deposition rate c) It would slightly increase the depth of penetration d) The arc would become unstable

Last Answer : b) Higher deposition rate

Description : A butt weld has been made by MMA in a 50mm thick impact tested steel plate. The welding electrode used was a basic type, 5mm diameter. The measured welding parameters for one of the runs was 250 amps, 24 volts, using DC ... given to calculate the arc energy b) 1.9 kJ/mm c) 1.87 kJ/mm d) 2.0 kJ/mm

Last Answer : d) 2.0 kJ/mm

Description : The internal auditing profession has advanced primarily as a result of a. Increased interest by Bachelor of Science in Accountancy (BSA) graduates and experienced auditors. b. The ... emphasis on background knowledge and skills. d. Increased complexity and sophistication of business operations.

Last Answer : Increased complexity and sophistication of business operations.

Description : Mark the correct option a) SDI/ASPDs shall be entitled to an incentive equal to 10% of the commission paid to the agents b) A policy holder of WLA PLI/RPLI shall be eligible for tacking ... child c) Mail overseer should have min 10th standard qualification for doing this job. d) All the above

Last Answer : d) All the above

Description : A postal franking machine is a stamping machine intended to stamp impressions of dies of approved design on private and official postal articles in payment of a) Postage and postal fee b) Handling charges c) Franking charges d) Special fee

Last Answer : a) Postage and postal fee

Description : Why is the OCV capped at voltage setting? a) To save electricity b) To prevent exploding of the consumable c) Allow smooth transition into welding voltage range d) To reduce the risk of fatality

Last Answer : c) Allow smooth transition into welding voltage range

Description : present the Counter Assistant is authorized to receive deposits and allow withdrawals up to Rs.--------------/- in savings accounts only under his own power without showing the documents to the Ledger Assistant and the Supervisor. a) 5000 b) 2000 c) 4000 d) None of these

Last Answer : a) 5000

Description : Can you still get in trouble if you admit poor workmanship long after a company went bankrupt?

Last Answer : I think it would depend on whether someone who was affected by your lies and poor workmanship had grounds and desire to file suit and hold you responsible for any damages.

Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor

Last Answer : (iv) As decided by site supervisor

Description : Project Scope: 1. is of concern only at the start of the project  2. is mainly a problem to be handled by the change control procedures during the project  execution phase.  3. Should ... . is usually not a problem after the contract or other document authorizing the project has been  approved.

Last Answer : 3. Should be managed and controlled from the project concept through close-out

Description : Which of the following statements is true? a. Assurance engagements do not require independence. b. The term auditor is broader in scope compared to the term practitioner. c. Assurance ... be provided by the practitioner is inversely related to the scope of procedures performed and their results

Last Answer : Assurance engagements performed by professional accountants are intended to enhance the credibility of information.

Description : To what extent do you think your supervisor(s) and management want you to be happy and inspired at work? Managers and Supervisors: To what extent do you want your employees to be happy and inspired at work?

Last Answer : answer:Not at all. We were taken over a year and a half ago. When the appointed President of our subsidiary came to meet us in a “town hall” meeting, he told us “we don’t care about you being happy or having fun at work. We are here to work.”

Description : do i need an actual welding table in order to be able to weld?

Last Answer : Need Answer

Description : Quantity is not a part of the weld symbol (i)Dark circle (ii) Open circle (iii) Angle of weld (iv)Starting and stopping allowance for welding

Last Answer : (iv)Starting and stopping allowance for welding

Description : Term which is not a part of the weld symbol (i) Tail (ii) Arrow (iii) Temperature of welding (iv) None

Last Answer : (iii) Temperature of welding

Description : Quantity which is not a part of the weld symbol (i)Length of welding (ii) Weld is made in the welding shop (iii) Welding is on both sides (iv) Machine used in welding

Last Answer : (iv) Machine used in welding

Description : Steels with high carbon equivalent have poor Weldability, because in these steels during welding (A) Carbon and other alloying elements get oxidised from the weld pool (B) Excessive ferrite forms in the ... of carbon and other element occurs in the weld pool leading to poor properties of the weld

Last Answer : (C) Martensite forms in the heat affected zone leading to poor toughness/ductility of the weld

Description : Coating provided on the electrodes used in the arc welding is not expected to (A) Add alloying elements (B) Prevent electrode from contamination (C) Stabilise the arc (D) Provide protective atmosphere to weld

Last Answer : (B) Prevent electrode from contamination

Description : Cold cracking in the heat affected zone of a high strength steel weld can take place because of the (A) Retained austenite (B) Martensite formation (C) Relatively high sulphur content in the base metal (D) Sufficient hydrogen present in the welding arc

Last Answer : (B) Martensite formation

Description : Ratings for welding neck flanges under ASME B16.5 are based upon which of the following? a) The flange thickness and 40,000 psi yield strength. b) The hub thickness at the welding end and ... psi yield strength. c) The weld metal yield strength. d) The piping wall thickness and yield strength.

Last Answer : b) The hub thickness at the welding end and 40,000 psi yield strength

Description : What is the testing frequency of new AT weld ? (i) Just after the welding (ii) After 7 days of welding (iii) With in the one month of welding* (iv) None of the above

Last Answer : iii) With in the one month of welding*

Description : In how many time final grinding should be done of new AT weld ? (i) Just after the welding (ii) After 8 hrs of welding (iii) With in 24 hrs* (iv) None of the above

Last Answer : iii) With in 24 hrs*

Description : In how many time rough riding should be done of new AT weld ? (i) Just after the welding* (ii) After 8 hrs of welding (iii) After 24 hrs (iv) None of the above

Last Answer : i) Just after the welding*

Description : After AT Welding First train is to be passed after ? (i) 20 Minutes from pouring of weld metal. (ii) 35 Minutes from pouring of weld metal. (iii) 30 Minutes from pouring of weld metal.* (iv) 25 Minutes from pouring of weld metal.

Last Answer : (iii) 30 Minutes from pouring of weld metal.*

Description : What are the types of express guarantees? 1. Design/ mechanical  2. Field workmanship  3. Common Work 4. Length of service  5. a and b

Last Answer : 5. a and b

Description : What BSEN standard is used for welding symbols on drawings? a) BS EN 970 b) BS EN 287 c) BS EN 22553 d) BS EN 4515

Last Answer : c) BS EN 22553