For complete stabilisation of organic matter in polluted water, it takes 

(A) 5 days 

(B) 10 days 

(C) 20 days 

(D) 30 days 

1 Answer

Answer :

(D) 30 days 

Related questions

Description : Assertion : BOD of river polluted by sewage is more than 20 ppm. Reason: Polluted river contains excess of organic matter.

Last Answer : Assertion : BOD of river polluted by sewage is more than 20 ppm. Reason: Polluted river contains excess ... true but reason is wrong D. Both are wrong

Description : High value of BOD (Biochemical Oxygen Demand)  indicates that (a) water is less polluted (b) consumption of organic matter in the water is  higher by the microbes  (c) water is pure (d) water is highly polluted.

Last Answer : (b) consumption of organic matter in the water is 

Description : High value of BOD (Biochemical Oxygen Demand) indicates that (a) water is less polluted (b) consumption of organic matter in the water is higher by the microbes (c) water is pure (d) water is highly polluted.

Last Answer : (b) consumption of organic matter in the water is higher by the microbes

Description : Bacterial aerobic oxidation of polluted water in biological oxidation ponds is done to purify it. Presence of bacteria helps in (A) Coagulation and flocculation of colloids (B) Oxidation of carbonaceous matter to CO2 (C) ... to the nitrite and eventually to the nitrate (D) All (A), (B) and (C)

Last Answer : (D) All (A), (B) and (C)

Description : Reserve Bank announced the cap under Market Stabilisation Scheme (MSS) which has been fixed at Rs 30,000 crore for the current fiscal. MSS was launched in the year A) 2001 B) 2006 C) 2005 D) 2004 E) None of these

Last Answer : D) 2004 Explanation: The scheme was launched in 2004.Under this scheme securities are issued with the objective of providing the RBI with a stock of securities with which it can intervene in the market for managing liquidity. These securities are issued not to meet the government‘s expenditure.

Description : Thickness of a pavement may be reduced considerably by (A) Compaction of soil (B) Stabilisation of soil (C) Drainage of soil (D) Combination of all the above

Last Answer : Answer: Option D

Description : The Particulate Matter (PM-10) exhaled from the polluted atmosphere is often filtered out during the process of (1) Coughing (2) Sneezing (3) A and B (4) Urination

Last Answer : (2) Sneezing Explanation: PM-10 is a particulate matter having an aerodynamic diameter of less than 10 gym. Particles larger than 10 microns tend to be filtered out in the nose and therefore do not enter the respiratory tract. 926.

Description : The Particulate Matter (PM-10) exhaled from the polluted atmosphere is often filtered out during the process of (1) Coughing (2) Sneezing (3) A and B (4) Urination

Last Answer : Sneezing

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : Biological Oxygen Demand (BOD) is a measure of: a. Industrial wastes poured into water bodies b. Extent to which water is polluted with organic compounds c. Amount of carbon monoxide inseparably combined with haemoglobin d. Amount of oxygen needed by green plants during night

Last Answer : Ans: A

Description : Waste/polluted water discharged from electroplating, blast furnace and coal mining industries contain mainly __________ substances. (A) Radioactive (B) Organic (C) Inorganic (D) None of these

Last Answer : (C) Inorganic

Description : Which is the best and the most effective method for the removal of organic contaminant present in the polluted water in very small quantity (say < 200 mg/litre)? (A) Lagooning (B) Activated carbon adsorption (C) Biological oxidation pond (D) Chemical coagulation

Last Answer : (B) Activated carbon adsorption

Description : Biological oxidation ponds remove organic matters present in the polluted water by (A) Using the activities of bacteria and other micro organisms (B) Aerobic oxidation (C) Both (A) & (B) (D) Neither (A) nor (B)

Last Answer : (C) Both (A) & (B)

Description : What is the major constituents of waste/polluted water discharged from textile, pulp & paper, tanning, distillery, dairy and meat packing industries? (A) Radioactive substances (B) Natural organic products (C) Inorganic pollutants (D) None of these

Last Answer : (B) Natural organic products

Description : Which is the most practical and economical method for removal of suspended solid matter from polluted water? (A) Sedimentation (B) Skimming off (C) Chlorination (D) Biological oxidation

Last Answer : (A) Sedimentation

Description : Which of the following is the most efficient for removal of very finely divided suspended solids and colloidal matter from the polluted waterstream? (A) Sedimentation tank (B) Circular clarifier (C) Mechanical flocculation (D) Chemical coagulation

Last Answer : (D) Chemical coagulation

Description : Sugarcane takes about how much time to complete its germination phase a).10 days b).15 days c). One month d). 60 days

Last Answer : c). One month

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : Rubika can do the 12 times the actual work in 72 days while sathya can do the one-half of the original work in 6 days. In how many days will both working together complete the 6 times of the original work? a) 20 days b) 25 days c) 30 days d) 35 days

Last Answer :  C Efficiency of Rubika = 16.666% Efficiency of sathya = 4.166% Total efficiency of rubika and sathya =(16+4) =20% Actual work 100/20=5 So, they can do actual work in 5 days So, 6 times work requires 30 days.

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : Pick out the wrong statement. (A) Biological oxygen demand (BOD) is a characteristic and not a constituent of water (B) BOD is a measure of the amount of oxygen which will be demanded & used in 5 days ... BOD is expressed in mg/litre (typically, BOD=2.5 mg/litre for potable water) (D) None of these

Last Answer : (D) None of these

Description : The Brake Horse power of the motor (efficiency 60%) required for a pump of capacity 0.075 cumec for a total lift of 12 m, is A. 10 B. 15 C. 20 D. 25 Q No: 44 Aerobic bacterias A. ... presence of free oxygen B. Consume organic matter as their food C. Oxidise organic matter in sewage D. All the above

Last Answer : ANS: D

Description : The magnitude of crystal field stabilisation energy (CFSE of `Delta_(1)`) in tetrahedral complexes is considerably less than that in the octahderal fi

Last Answer : The magnitude of crystal field stabilisation energy (CFSE of `Delta_(1)`) in tetrahedral complexes is ... Both point (A) and (B) are wrong.

Description : The magnitude of crystal field stabilisation energy (CFSE of `Delta_(1)`) in tetrahedral complexes is considerably less than that in the octahderal fi

Last Answer : The magnitude of crystal field stabilisation energy (CFSE of `Delta_(1)`) in tetrahedral complexes is ... Both point (A) and (B) are wrong.

Description : Removal of light fractions from crude oil is called its (A) Sweetening (B) Dehydration (C) Stabilisation (D) Visbreaking

Last Answer : (C) Stabilisation

Description : Stabilisation of gasoline (petrol) means (A) Removal of dissolved gases from it (B) Increasing its oxidation stability (C) Improving its lead susceptibility (D) Increasing its vapour pressure

Last Answer : (A) Removal of dissolved gases from it

Description : Which of the following processes is used for the production of petroleum coke? (A) Stabilisation (B) Visbreaking (C) Cracking (D) Reforming

Last Answer : (C) Cracking

Description : Use of catalyst is a must in the ammonia manufacture, because the reaction is reversible as well as the heat of dissociation of N2 & H2 is high. The presence of promoter along with the catalyst helps in ... B) Increasing the effectiveness (C) Improving the strength & heat resistance (D) All a, b & c

Last Answer : (D) All a, b & c

Description : The ratio of oxygen available to the oxygen required for stabilisation of sewage is called the (A) Bacterial stability factor (B) Relative stability (C) Biological oxygen demand (BOD) (D) Oxygen ion concentration

Last Answer : (B) Relative stability

Description : Aggressive pricing is typical during the __________ stage of the product life cycle. A)decline B)growth C)introduction D)plateau E)stabilisation

Last Answer : B)growth

Description : Which one is not a function of money ? (1) Transfer of value (2) Store of value (3) Price stabilisation (4) Value measurement

Last Answer : Price stabilisation

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : In India, 50 % of all sickness and 30 % of all deaths occur due to polluted and contaminated

Last Answer : In India, 50 % of all sickness and 30 % of all deaths occur due to polluted and contaminated A. Soil B. Nitrates C. Carbonates D. Phosphates

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days 27

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : Check valves are installed (A) On the delivery side of the pumping set (B) At the interconnections between polluted water system and a potable water system (C) Both (a) and (b) (D) Neither (a) nor (b)

Last Answer : (C) Both (a) and (b)

Description : Where an application is made to a public authority requesting for an information  which is held by another public authority, or the subject matter of which is more closely  connected with the functions of another public ... receipt of the application. a) 30 days b) 10 days c) 3 days d) 5 days

Last Answer : d) 5 days

Description : A and B can do a work in 30 days and 10 days respectively. If they work on alternate days beginning with A, in how many days will the work be complete

Last Answer : A and B can do a work in 30 days and 10 days respectively. If they work on alternate days ... A, in how many days will the work be completed?

Description : Chlorination of water does not remove (A) Ammonia content (B) B.O.D. (C) Organic matter content (D) Dissolved oxygen

Last Answer : (D) Dissolved oxygen

Description : Disappearance of pink colour of water of a well due of KMnO4 indicates that water contains (A) Acidity (B) Alkalinity (C) Turbidity (D) Organic matter

Last Answer : (D) Organic matter

Description : Standard unit of turbidity of water is in one litre of distilled water, one milligram of finely divided  (A) Silica  (B) Mud  (C) Clay  (D) Organic matter 

Last Answer : (A) Silica 

Description : Consider the following statements : Activated sludge process can be said to comprise : 1. Conversion of dissolved organic matter into biological flocs 2. Removal of dissolved BOD of the waste water 3. Digestion of the sludge Which ... 2 and 3 (b) 1 and 2 only (c) 2 and 3 only (d) 1 and 3 only

Last Answer : (b) 1 and 2 only

Description : With regard to the cornea: a. photokeratitis occurs with wavelength of 270nm b. microvilli are found in the outer layer of the epithelium c. the turnover of the corneal epithelium typically takes 30 days d. the corneal epithelium is about 10 layers in thickness

Last Answer : photokeratitis occurs with wavelength of 270nm

Description : Which one of the following statements is true? (A) Clays are more porous than sands (B) Pressure of organic matter in a soil decreases the bearing capacity of the soil (C) Aluminous cement is used for foundations in soils with chemical deposits (D) All the above

Last Answer : (D) All the above

Description : Consider the following statements: 1. Organic matter decreases the permeability of a soil. 2. Entrapped air decreases the permeability of a soil. Which of these statements are correct? (a) 1 only (b) 2 only (c) Both 1 &2 (d) Neither 1 nor 2

Last Answer : (c) Both 1 &2

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Last Answer : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.