How do you compute mw to mwh?

1 Answer

Answer :

Feel Free to Answer

Related questions

Description : How do you Convert 33MVA to MWH?

Last Answer : Feel Free to Answer

Description : The energy consumption and production patterns in a chemical plant over a 9 month period is provided in  the table below; Month 1 2 3 4 5 6 7 8 9 Production in Tonnes / month 493 ... and give your inference on the  result ? ( consider 9 month data for evaluation for predicted energy consumption)

Last Answer : It is required to use the equations Y= mX + C and  nC + mΣX = ΣY  cΣX + mΣX2 = ΣXY Month X =  Production in  Tonnes /  month Y =Energy  Consumption MWh  /month  X 2 XY 1 493 78.2 ... 73.7 54756 17240.63 8 239 64.4 57121 15402.96 9 239 72.1 57121 17228.98 3387 665.3 1410683 253221

Description : A manufacturing industry plans to improve its energy performance under PAT through  implementation of an energy conservation scheme. After implementation, calculate the  Plant Energy Performance (PEP) with 2015-16 as the ... 34,000 T,   Reference year (2015-16 ) Energy consumption - 27,200 MWh.

Last Answer : Production factor (PF) = 28750/34000 = 0.846 …………………….1 mark Ref year equivalent energy (RYEE) = Ref Year Energy Use (RYEU) x PF   = 27,200 x 0.846= 23011MWh

Description : How were you affected by the MW/NE Blackout of Aug. 14, 2003?

Last Answer : in the dark ,sorry lol

Description : 10 parts per billion ozone (MW=48) equals how much ozone in ug/m3?

Last Answer : Is this your homework????

Description : What is equal to 1 MW ?

Last Answer : 1 MW = 10000 watts.

Description : what gov. grant is available for solar farm 1 to 5 MW?

Last Answer : what gov. grants are available for solar farm 1 to 5 MW

Description : Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located? (1) Arunachal Pradesh (2) Bhutan (3) Nepal (4) Himachal Pradesh

Last Answer : (2) Bhutan Explanation: Tala Hydroelectricity project is the biggest hydroelectric joint project between India and Bhutan so far, generating 4865 GWh/yr. Tala is located in Chukha Dzongkhag in western ... planned for June 2005, but because of geological problems this was delayed until March 2007.

Description : In measuring crosstalk using dBx unit the reference power is A. 1 mW B. 1 W C. 1 pW D. 6 mW

Last Answer : C. 1 pW

Description : Part of a microwave link can be approximated by free space conditions. The antenna gain are each 40 dB, the frequency is 10 GHz, and the path length is 80 km. Calculate the receive power for a transmitted power of 10 W? A. 0.871 μW B. 871 μW C. 0.871 mW D. 871 nW

Last Answer : A. 0.871 μW

Description : ECE Board Exam November 1996 What is the applied power if a thermal RF wattmeter is connected to a transmitter through a variable attenuator? The wattmeter reads 84 mW when 15 dB of attenuation is used. A. 4.656 watts B. 2.656 watts C. 3.656 watts D. 2.856 watts

Last Answer : B. 2.656 watts

Description : ECE Board Exam November 1996 What is the applied power if a thermal RF wattmeter is connected to a transmitter through a variable attenuator? The wattmeter reads 84 mW when 15 dB of attenuation is used. A. 4.656 watts B. 2.656 watts C. 3.656 watts D. 2.856 watts

Last Answer : A. PAM

Description : ECE Board Exam March 1996 The power of standard test tone is normally ____________. A. 1 dB B. 0 mW C. 1 mW D. 1 W

Last Answer : C. 1 mW

Description : Nuclear power generation capacity in India is (A) 3000 MW (B) 10000 MW (C) More than hydroelectric power generation capacity (D) More than thermal power generation capacity

Last Answer : (A) 3000 MW

Description : Bhabha Atomic Research Centre (BARC) located at Trombay (near Bombay, INDIA) has (A) Five operating research reactors (namely Apsara, Cirus Zerelina, Purnima and Dhurva) (B) A 420 MW nuclear power plant (C) A very large capacity (100 tons/yr) heavy water plant (D) All (A), (B) and (C)

Last Answer : (A) Five operating research reactors (namely Apsara, Cirus Zerelina, Purnima and Dhurva)

Description : Tarapur (INDIA) atomic power station (A) Has two boiling water reactors of American design (B) Has an installed capacity of 400 MW (C) Is the first power reactor in India, which became critical in 1969 (D) All (A), (B) and (C)

Last Answer : (D) All (A), (B) and (C)

Description : Among which locomotive steam engines have the highest efficiency? a) 1 MW b) 2 MW c) 30 MW d) 660 MW

Last Answer : d) 660 MW

Description : A cylinder contains oxygen at a pressure of 10 atm and a temperature of 300 K. The volume of the cylinder is 10 liters. What is the mass of the oxygen in grams? Molecular weight (MW) of oxygen is 32 g/mole?  a. 125.02  b. 130.08  c. 135.05  d. 120.04

Last Answer : 130.08 {(10atm)(10)(32)/(0.0821) (300K)}

Description : A 0.064 kg of octane vapor (MW = 114) is mixed with0.91 kg of air (MW = 29.0) in the manifold of an Engine. The total pressure in the manifold is 86.1 kPa, and a temperature is 290 K. assume octane behaves ideally. What is ... of the air in the mixture in KPa?  a. 46.8  b. 48.6  c. 84.6  d. 64.8

Last Answer : 84.6

Description : For a single mode optical cable with 0.25 dB/km loss, determine the optical power 100 km from a 0.1-mW light source. ∙ A. -45 dBm ∙ B. -15 dBm ∙ C. -35 dBm

Last Answer : ∙ C. -35 dBm

Description : The electrical power unit Giga Watt (GW) may be written as a) 1,000,000 MW b) 1,000 MW c) 1,000 kW d) 1,000,000 W

Last Answer : b) 1,000 MW

Description : The voltage at the two ends of a transmission line are 132 KV and its reactance is 40 ohm. The Capacity of the line is (A) 435.6 MW (B) 217.8 MW (C) 251.5 MW (D) 500 MW

Last Answer : (A) 435.6 MW

Description : With direct water cooling it is possible to have ratings of about (a) 200 MW (b) 300 MW (c) 400 MW (d) 600 MW

Last Answer : (d) 600 MW

Description : With conventional hydrogen cooling it is possible to increase the rating of a single unit to (a) 50 MW (b) 100 MW (c) 200 MW (d) none ofthe above

Last Answer : (c) 200 MW

Description : Multiple inlet system of air cooling of turbo-alternators can be used for machines of rating upto (a) 10 MW (b) 30 MW (c) 60 MW (d) 150 MW

Last Answer : (c) 60 MW

Description : By the year 2022, the Climate Change Action Plan of Government of India aims at installing (A) 20,000 MW of wind power (B) 25,000 MW of wind power (C) 20,000 MW of solar power (D) 10,000 MW of solar power

Last Answer : (C) 20,000 MW of solar power

Description : Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located ? (1) Arunachal Pradesh (2) Bhutan (3) Nepal (4) Himachal Pradesh

Last Answer : Bhutan

Description : Write the IF value of (i) FM ratio recevier. (ii) MW band AM.

Last Answer : (i) 10.7 Mhz (ii) 455 Khz

Description : For steam power plant having capacity 600 MW capacity a cooling tower is required to set up with condenser. Suggest the type of condenser and cooling tower with justification. 

Last Answer : For Steam power plant having Capacity 600 MW the requirement of condenser and cooling tower is as follow. 1) Condenser:- Given Capacity is medium to low capacity for this we can use Jet Condenser ... and efficiency of tower is high  -Temperature of water coming out from tower can be controlled.

Description : A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: A) 2.19 x 106 MWhr B) 600 MWhr C) 250 MWhr D) 7.50 x 106 MWhr

Last Answer : A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: 2.19 x 106 MWhr 

Description : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained constant at 11 kV. The per ... 11 kV is  (A) 100 MVAR (B) 10.1 MVAR (C) -100 MVAR (D) -10.1 MVAR

Last Answer : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained ... load to increase the line-to-line voltage at the load terminals to 11 kV is -10.1 MVAR

Description : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes (A) 0.85 (B) 1.00 (C) 0.80 lag (D) 0.90 lag

Last Answer : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes  0.80 lag

Description : A loss less transmission line having Surge Impedance Loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30%. Then, SIL of the compensated transmission line will be (A) 1835 MW (B) 2280 MW (C) 2725 MW (D) 3257 MW

Last Answer : A loss less transmission line having Surge Impedance Loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30%. Then, SIL of the compensated transmission line will be 2280 MW

Description : A 500 MW, 3-phase, Y-connected synchronous generator has a rated voltage of 21.5 kV at 0.85 p.f. The line current when operating at full load rated conditions will be  (A) 13.43 kA (B) 15.79 kA (C) 23.25 kA (D) 27.36 kA

Last Answer : A 500 MW, 3-phase, Y-connected synchronous generator has a rated voltage of 21.5 kV at 0.85 p.f. The line current when operating at full load rated conditions will be 15.79 kA

Description : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is   (a) 5 MW (b) 4 MW (c) 6 MW (d) 10 MW 

Last Answer : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW

Description : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, ... system frequency is (A) 50 Hz (B) 51 Hz (C) 51.25 Hz (D) 51.5 Hz

Last Answer : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, respectively. Then the system frequency is 50 Hz

Description : For a 210 MW, turbo-alternator in a thermal power plant, the possible specifications of rotor diameter, stator core length, and number of poles, respectively, are (A) 4.4 m, 1.2 m, 12 (B) 1.2 m, 4.4 m, 2 (C) 4.4 m, 1.2 m, 24 (D) 1.2 m, 4.4 m, 8

Last Answer : For a 210 MW, turbo-alternator in a thermal power plant, the possible specifications of rotor diameter, stator core length, and number of poles, respectively, are 1.2 m, 4.4 m, 2

Description : The output power of a filter is 100 mW, when the signal frequency is 6 kHz. When the frequency is increased to 25 kHz, the output power falls to 50 mW. What is the dB change in power ? (a) -3 dB (b) -5 dB (c) -7 dB (d) -2 dB

Last Answer : The output power of a filter is 100 mW, when the signal frequency is 6 kHz. When the frequency is increased to 25 kHz, the output power falls to 50 mW. What is the dB change in power ?  -3 dB 

Description : A three phase transmission line delivers a load of 5 MW at 0.8 power factor lagging. Resistance of each conductor is 0.5 ohm / km. Receiving end voltage is 33 kV. If the line loss is not to exceed 10%, determine the length of the line.  (A) 7 km (B) 27.9 km (C) 56.8 km (D) 13.9 km

Last Answer : B

Description : Calculate the power loss, if power generated by two plants are P1=50 MW and P2 =40 MW and the loss coefficients are B11=0.001, B22=0.0025 and B12=-0.0005.  (A) 4.5 MW (B) 5.5 MW (C) 6.5 MW (D) 8.5 MW

Last Answer : A

Description : A generating st ation has a maximum, demand of 20 mW, load factor of 60%, a plant capacity factor of 50% and a plant Use factor of 72%. What is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded?

Last Answer : 5 MW is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded.

Description : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be

Last Answer : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be 720 MW.

Description : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 

Last Answer : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 103.2 MW, 51.61 .

Description : A cylindrical cable of core radius 1.25cm and impregnated paper insulation of thickness 2.13cm and relative permittivity 3.5. Compute the capacitance of the cable/km (in nF

Last Answer : To calculate the capacitance of the cable per kilometer, you can use the following formula: C = ε * ε0 * A / d where: C is the capacitance of the cable per kilometer (in farads) ε is ... * 10^9 = 644 nF/km So the capacitance of the cable per kilometer would be approximately 644 nanofarads.

Description : How do I compute sales tax for purchases made from another state?

Last Answer : answer:You might not need to charge any tax. The old rule was to tax only if the business had a store in the state being shipped to. The tax charged would be the ship to state's tax. So for ... books for the business and inform you what to keep track of, how to pay any required quarterly taxes, etc.

Description : How do I correctly compute startup valuation?

Last Answer : pallen123 That is how I know valuation to work. Yes, the investor would own 10%.

Description : Why is there no formula to compute the half-life of any given radioisotope?

Last Answer : I don’t think the theories contain enough information about what is actually going on with subatomic particles that leads to those results.

Description : Compute various manufacturing overhead rates?

Last Answer : answer:Hi @shaundracobb, welcome to Fluther! This appears to be a homework question for an Econ class, is that correct? I ask because simply answering homework questions is frowned upon here. You may find people ... more helpful. Sorry I can't be one of those people today I don't know Econ :-)

Description : Can you compute the ratio of shapes on a soccer ball?

Last Answer : answer:I think the answer to your question is “no”. Just visualising a ball like that is making my visual cortex short-circuit. And then go on strike demanding better working conditions. Interesting question though.

Description : [Curiosity, not homework] How do you compute the balance point for an asymmetrical hanging object?

Last Answer : I'm a little rusty in Physics 1, but I think this works. When you calendar is suspended draw a virtual (or physical) line from the point of suspension (the clip) directly towards the ground ( ... in the desired position and attach the clip so that it is directly above the centre of gravity. Voila?