A generating st ation has a maximum, demand of 20 mW, load factor of 60%, a plant capacity factor of 50% and a plant Use factor of 72%. What is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded?

1 Answer

Answer :

5 MW is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded.

Related questions

Description : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be

Last Answer : A generating station has a maximum demand of 50 Mw, a load factor of 60%, a plant capacity factor of 45% and if the plant while running as per schedule, were fully loaded. The daily energy produced will be 720 MW.

Description : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is   (a) 5 MW (b) 4 MW (c) 6 MW (d) 10 MW 

Last Answer : A generating station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW

Description : A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: A) 2.19 x 106 MWhr B) 600 MWhr C) 250 MWhr D) 7.50 x 106 MWhr

Last Answer : A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: 2.19 x 106 MWhr 

Description : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is  (1) 122.8 GWh (2) 198.55 GWh (3) 128.2 GWh (4) 188.82 GWh

Last Answer : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is 122.8 GWh

Description : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained constant at 11 kV. The per ... 11 kV is  (A) 100 MVAR (B) 10.1 MVAR (C) -100 MVAR (D) -10.1 MVAR

Last Answer : A 3-phase 11 kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to line voltage at the terminals of the machine is maintained ... load to increase the line-to-line voltage at the load terminals to 11 kV is -10.1 MVAR

Description : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes (A) 0.85 (B) 1.00 (C) 0.80 lag (D) 0.90 lag

Last Answer : At an industrial sub-station with a 4 MW load, a capacitor of 2 MVAR is installed to maintain the load power factor at 0.97 lagging. If the capacitor goes out of service, the load power factor becomes  0.80 lag

Description : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 

Last Answer : A power station supplies the peak load of 60 Mw, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55. The maximum demand on the station and average load respectively will be 103.2 MW, 51.61 .

Description : In a power generating station the Demand Factor and Load Factor are 0.5 and 0.2, respectively. If the connected load is 400 MW, the average demand is (A) 40 MW (B) 100 MW (C) 140 MW (D) 280 MW

Last Answer : In a power generating station the Demand Factor and Load Factor are 0.5 and 0.2, respectively. If the connected load is 400 MW, the average demand is 40 MW

Description : The transport The transportation method may be used to determine ation method may be used to determine the costs of the costs of alternati alternative strategies for ve strategies for anticipation ... planning period b)Aggregate demand per planning period c)Beginning inventory d)All of the above

Last Answer : d)All of the above

Description : A loss less transmission line having Surge Impedance Loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30%. Then, SIL of the compensated transmission line will be (A) 1835 MW (B) 2280 MW (C) 2725 MW (D) 3257 MW

Last Answer : A loss less transmission line having Surge Impedance Loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30%. Then, SIL of the compensated transmission line will be 2280 MW

Description : A three phase transmission line delivers a load of 5 MW at 0.8 power factor lagging. Resistance of each conductor is 0.5 ohm / km. Receiving end voltage is 33 kV. If the line loss is not to exceed 10%, determine the length of the line.  (A) 7 km (B) 27.9 km (C) 56.8 km (D) 13.9 km

Last Answer : B

Description : n a chemical factory where dyes are made, wet cake at 30 OC consisting of 60% moisture  is put in a dryer to obtain an output having only 5% moisture, at atmospheric pressure. In  each batch about 120 ... dryer and the dryer efficiency  is 80%. Latent heat of steam at 4 kg/cm2 is 520 kcal/kg.

Last Answer : Given that   Qty of material dried per batch - 120 Kgs  Moisture at inlet - 60% a. The quantity of moisture removed per batch.  Water quantity in a wet batch - 120 x 0.6 = 72 Kgs.  Quantity of bone dry ... - 48/0.95 = 50.5 Kgs.  Equivalent water in a dry batch - 50.5 - 48 = 2.5 Kgs.

Description : The maximum demand of consumer is 2 kW and his daily energy consumption is 20 units. Its Load Factor is (1) 10.15% (2) 41.6 % (3) 50 % (4) 60% 

Last Answer : Total maximum demand of energy in a day = 2kw*24= 48 units Consumer consumption is 20 units . Load factor = (number of units utilizing)/(total max. demand)      = 20/48 = 41.6%

Description : Define the following terms:- Reliability, Maximum demand, Reserve-generating capacity, Availability (operational).

Last Answer : Reliability: It is the capacity of the power system to serve all power demands without failure over long periods. Maximum Demand: It is maximum load demand required in a power station during a given ... percentage of the time a unit is available to produce power whether needed by the system or not.

Description : If the Anglo-Indian community does not get adequate representation in the Lok Sabha, two members of the community can be nominated by the – (1) Prime Minister (2) President (3) Speaker (4) President in consult-ation with the Parliament

Last Answer : (2) President Explanation: The Constitution limits the Lok Sabha to a maximum of 552 members, including no more than 20 members representing people from the Union Territories, and two ... represent the AngloIndian community (if the President feels that the community is not adequately represented).

Description : Give the term for contraction and relax- ation of heart:?

Last Answer : Systole; diastole

Description : What will be the efficiency when the transformer operates at unity power factor and 60% of full load 

Last Answer : What will be the efficiency when the transformer operates at unity power factor and 60% of full load 96.5%

Description : Load factor is the  (1) Ratio of maximum load on the station to sum of consumer's maximum load.  (2) Ratio of average demand to maximum demand.  (3) Factor used for increasing load.  (4) Reciprocal of (1).

Last Answer : Load factor is the Ratio of average demand to maximum demand. 

Description : A transformer has negative voltage regulation when its load power factor is   (1) Zero (2) Unity (3) Leading (4) Lagging

Last Answer : 0

Description : The load duration curve for unity load factor will be of  (1) Rectangular shape (2) Triangular shape (3) L -shape (4) I -shape

Last Answer : The load duration curve for unity load factor will be of Rectangular shape

Description : A 3-phase, 11 kv, 50 Hz, 200 kW load has a power factor of 0.8 lag. A delta connected 3-phase capacitor is used to improve the power factor to unity. The capacitance perphase of the capacitor in micro-farads is?

Last Answer : A 3-phase, 11 kv, 50 Hz, 200 kW load has a power factor of 0.8 lag. A delta connected 3-phase capacitor is used to improve the power factor to unity. The capacitance perphase of the capacitor in micro-farads is 1.316.

Description : A consumer consumes. 600 kWh per day at a load factor of 0.40. If the consumer increases the load factor of 0.70 without increasing the maximum demand, what is the consumption of energy in kWh?

Last Answer : A consumer consume. 600 kWh per day at a load factor of 0.40. If the coneumer increases the load factor of 0.70 without increasing the maximum demand, 1050 kWh is the consumption of energy in kWh.

Description : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, ... system frequency is (A) 50 Hz (B) 51 Hz (C) 51.25 Hz (D) 51.5 Hz

Last Answer : Two synchronous generators operating in parallel supply a common load of 2.5 MW. The frequency-power characteristics have a common slope of 1 MW/Hz and the no-load frequencies of the generators are 51.5 Hz and 51.0 Hz, respectively. Then the system frequency is 50 Hz

Description : Define the following: Average demand, Maximum demand, Demand factor, Load factor.

Last Answer : Average Demand: the average power requirement during some specified period of time of considerable duration is called the average demand of installation. Maximum Demand: The maximum demand of an installation ... Load Factor: It is defined as the ratio of the average power to the maximum demand.

Description : The connected load of a consumer is 2 kW and his maximum demand is 1.5 kW. The load factor of the consumer is (a) 0.375 (b) 0.75 (c) 1.33 (d) None of these  

Last Answer : a

Description : What is the maximum value of a load which consume 500 KWh per day at a load factor of 0.40, if the consumer increases the load factor of 0.50 without increasing the maximum demand?

Last Answer : 52.08 kW is the maximum value of a load which consume 500 KWh per day at a load factor of 0.40, if the consumer increases the load factor of 0.50 without increasing the maximum demand.

Description : The marketing function's main concern is with (a) producing goods or providing services ; (b) procuring materials, supplies, and equipment (c) building and maintaining a positive image ; (d) generating the demand for the organization's products or services

Last Answer :  (d) generating the demand for the organization's products or services 

Description : By the year 2022, the Climate Change Action Plan of Government of India aims at installing (A) 20,000 MW of wind power (B) 25,000 MW of wind power (C) 20,000 MW of solar power (D) 10,000 MW of solar power

Last Answer : (C) 20,000 MW of solar power

Last Answer : Generating capacity connected to the bus bars and ready to take load when switched on is known as spinning reserve.

Description : Which of the following is true about the Accounts Receivable Lag and its implications on demand? a. If you offer no credit, demand falls to about 60% of normal. b. At 30 days, demand is 90%. c. At 45 days, demand is 95%. d. At 60 days, demand is 98.5%. e. At 90 days, demand is 100%.

Last Answer : d. At 60 days, demand is 98.5%.

Description : Name three conventional ways of generating power. Of these three, which one contributes maximum generation in India.

Last Answer : Coal, Gas and Hydro are the examples of conventional method of generating power. Coal contributes maximum generation in India. India generates 219.81 Gw by thermal power plant (coal).

Description : The graph shown in the illustration represents the speed droop curves of two equal capacity alternators about to be paralleled. When paralleled, the greater portion of the total load above 60% for each unit will be picked up ... unit 'A' B. by unit 'B' C. equally by each unit D. none of the above

Last Answer : Answer: A

Description : Higher plant efficiency up to______ over the entire load range. a. 30%-50% b. 20%-40% c. 60%-90% d. 50%-80%

Last Answer : a. 30%-50%

Description : The ratio of current year‘s production to the reference year‘s production is called as a) Demand factor b) Production factor c) Utilisation factor d) Load factor

Last Answer : Production factor 

Description : If the reference bus is changed in two load flow runs with same system data and power obtained for reference bus taken as specified P and Q in the latter run, the system losses  A) Will be ... C) As well as complex bus voltage will changed D) As well as complex bus voltage will be unchanged

Last Answer : If the reference bus is changed in two load flow runs with same system data and power obtained for reference bus taken as specified P and Q in the latter run, the system losses Will be unchanged but complex bus voltages will change

Description : If a voltage-controlled bus is treated as load bus, then which one of the following limits would be violated?   (a) Active power (b) Reactive power (c) Voltage (d) Phase angle 

Last Answer : If a voltage-controlled bus is treated as load bus, then which one of the following limits would be violated?   (a) Active power (b) Reactive power (c) Voltage (d) Phase angle 

Description : In load flow Study, a PV bus is treated as a PQ bus when

Last Answer : Voltage at the bus becomes high 

Description : Generally in a power system network, the load is represented as a :  (A) Constant power in both load flow study and in stability study  (B) Constant power in load flow study and constant ... impedance in load flow study  (D) Constant impedance in both load flow study and in stability study

Last Answer : Generally in a power system network, the load is represented as a : Constant power in load flow study and constant impedance in stability study 

Description : Load compensation in power systems is a process to :  (A) Maintain better voltage profile (B) Increase short circuit capacity of the system (C) Generate required harmonics for loads like arc furnaces (D) Compensate for the line reactance

Last Answer : Load compensation in power systems is a process to : Maintain better voltage profile

Description : The sequence components of current of a single-phase load connected to a 3-phase system are (A) equal positive and negative sequence components (B) equal positive, negative and zero sequence components (C) vector sum of sequence currents is zero (D) algebraic sum of sequence currents is zero

Last Answer : The sequence components of current of a single-phase load connected to a 3-phase system are equal positive, negative and zero sequence components

Description : In load flow analysis, the load connected at a bus is represented as?

Last Answer : constant real and reactive powers drawn from bus

Description : A 60 Hz, 320 km lossless line has Bending end voltage 1.0 p.u, The receiving end voltage on no load is?

Last Answer : A 60 Hz, 320 km lossless line has Bending end voltage 1.0 p.u, The receiving end voltage on no load is 1.088 p.u.

Description : The yearly load duration curve of a power plant is a straight line. The maximum load is 750 MW and the minimum load is 600 Mw. The capacity of the plant is 900 MW. What is the capacity factor and utilization factor? 

Last Answer : 0.75, 0.83 is the capacity factor and utilization factor.

Description : An industrial consumer hall a daily load pattern of 2000 KW, 0.8 lag for 12 Hra and 1000 kW UPF for 1J Hr. The load factor i= _____. 

Last Answer : An industrial consumer hall a daily load pattern of 2000 KW, 0.8 lag for 12 Hra and 1000 kW UPF for 1J Hr. The load factor i= 0.6 . 

Description : It is always economical to improve the power factor of an electric installation to (a) zero (b) unity (c) a little less than unity (d) a little more than unity 

Last Answer : To  a  little  less  than  unity.

Description : A 50 Hz, 4-pole, 500 MVA, 22 kV turbo-generator is delivering rated megavolt amperes at 0.8 power factor. Suddenly a fault occurs reducing in electric power output by 40%. Neglect losses and assume constant power input to the ... the time of fault will be  (A) 1.528 (B) 1.018 (C) 0.848 (D) 0.509

Last Answer : A 50 Hz, 4-pole, 500 MVA, 22 kV turbo-generator is delivering rated megavolt amperes at 0.8 power factor. Suddenly a fault occurs reducing in electric power output by 40%. Neglect losses and assume ... the shaft. The accelerating torque in the generator in MNm at the time of fault will be 1.018 

Description : The knowledge of diversity factor helps in computing  (1) Plant capacity (2) Average load (3) Units (kWh) generated (4) Peak demand

Last Answer : The knowledge of diversity factor helps in computing Plant capacity

Description : The benefit of power factor correction in a power system is (A) lower power consumption (B) increased demand charge (C) reduced load carrying capabilities in existing lines (D) reduced voltage profile

Last Answer : The benefit of power factor correction in a power system is lower power consumption

Description : Which one of the following products is most likely to have an inverted C -shaped demand curve? A)Wrangler jeans B)Georgio perfume C)Maxwell House coffee D)St Michael christmas cake E)Ford Sierra

Last Answer : B)Georgio perfume