In flange splices when the number of hammer and hand loose rivets is 30% or more of  the total rivets on any side of the splice location,  
a) Need no be renewed
b) wait for 100% loose rivets  
c) all the rivets should be renewed.*
d) None of the above

1 Answer

Answer :

c) all the rivets should be renewed.*

Related questions

Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*

Last Answer : d) All the above*

Description : Consider the following statements in respect of design of web and flange as splices: 1. Flange splice shall be designed for actual BM at the section. 2. Flange splice shall be designed to resist the actual shear at the section. 3. Web ... are correct? (a) 1 and 3 (b) 2 and 3 (c) 3 and 4 (d)1 and 4

Last Answer : (a) 1 and 3

Description : Renewal of loose rivet shall be taken up in end bearing stiffener when the % of hammer loose rivet is

Last Answer : 30%

Description : Which of the splices discussed is NOT a butted splice? for noninsulated splices and terminal lugs?

Last Answer : Spaghetti or heat-shrinkable tubing.

Description : Side looking 700 2MHZ probe is tested for detecting. (i) Flaw in head (ii) Flaw in web (iii) Half moon crack in flange.* (iv) For all above.

Last Answer : iii) Half moon crack in flange

Description : The minimum pitch of rivets of diameter ‘d’ in steel plates shall be a) 2 x d b) 3 x d c) 1.75 x d d) 2.5 x d*

Last Answer : d) 2.5 x d*

Description : The minimum edge distance for rivets of diameter ‘d’ in steel plates shall be a) 2 x d b) 3 x d c) 1.5 x d* d) 2.5 x d

Last Answer : c) 1.5 x d*

Description : The most effective method of locating a loose commutator bar in a D.C. motor is by _____________. A. visual inspection B. jiggling each by hand C. sounding each bar with a light weight hammer D. checking with a calibrated torque wrench

Last Answer : Answer: C

Description : Tandem rig test with 450 probe for AT weld detects. (i) Horizontal longitudinal defect in weld. (ii) Vertical oriented defect in AT weld.* (iii) Transverse defect in AT weld. (iv) Defect in flange of AT welds.

Last Answer : (ii) Vertical oriented defect in AT weld.*

Description : In shallow type girders, the rail level shall be a) 25mm above the top flange of girder* b) near the bottom of the girder c) near the middle of the girder d) below the girder

Last Answer : a) 25mm above the top flange of girder*

Description : Minimum depth of space for wheel flange form rail level in B.G. is …… mm (A) 35 (B) 38* (C) 42 (D) 45

Last Answer : (B) 38*

Description : The condition will be called as thin flange, when the flange thickness becomes less the: (a) 10mm (b) 12mm (c) 16mm* (d) 15mm

Last Answer : (c) 16mm*

Description : When flange contact of wheel leads tread contact. Then it is known as: (a) Zero angularity (B) Negative angularity (c) Positive angularity* (d) none of these

Last Answer : (c) Positive angularity*

Description : As per IRCA rules, the rejection limits for wheel flange thickness is - (a) 38mm (b) 25.4mm (c) 16mm* (d) 20 mm

Last Answer : (c) 16mm*

Description : What is the difference between rail flange of 60 kg & 52 rail section a. 20 mm b. 18 mm c. 14 mm* d. 16 mm

Last Answer : c. 14 mm

Description : The weight of rivet testing hammer is

Last Answer : 110 gm

Description : Rebound hammer is used for a) To find the strength of concrete* b) To form rivet heads c) To break the concrete structures d) None of the above

Last Answer : a) To find the strength of concrete*

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : While doing final location survey, the centre line is fully marked with pegs at --- metre distance (a) 10m (b) 20m* (c) 30m (d) 50m

Last Answer : (b) 20m*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : The average humidity percentage recommended for interior plants is: a. 70 to 100% b. 40 to 70% c. 20 to 30% d. 10 to 20%86.

Last Answer : 40 to 70%

Description : Approximately how many businesses are used content marketing?  10 to 20%  25 to 30%  80 to 90%  100%

Last Answer : 80 to 90%

Description : Approximately how many businesses are used content marketing?  10 to 20%  25 to 30%  80 to 90%  100% 1. the customer review of a product on an E-Commerce website. a)Awareness about the brand b)Awareness about the product c)Experience the product d)Both a&c Answer: b

Last Answer :  80 to 90%

Description : If a company has net sales of $500,000 and cost of goods sold of $350,000, the gross profit percentage is a. 70%. b. 30%. c. 15%. d. 100%.

Last Answer : b. 30%

Description : Turbo chargers or super chargers increases engine power by A. 10-20% C. 50-60% B. 20-30% D. 90-100%

Last Answer : A. 10-20%

Description : The wash hand basin shall be fixed at a height of (a) 75-80 cm* (b) 75 cm (c) 80 cm (d) Not specified

Last Answer : (a) 75-80 cm*

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : In new Rail as well as second hand rails how much end bends of the rails in vertical are permitted when checked with one meter straight edge before welding? (i) +0.5mm, -0 mm in vertical * (ii) +0.2mm, -.3 mm in vertical (iii) +0.3mm, -2 mm in vertical (iv) 0 mm, +.5 mm in vertical

Last Answer : (i) +0.5mm, -0 mm in vertical *

Description : Total no. of probes fitted on digital double rail tester for rail testing are (i) 12 (ii) 8 (iii) 14* (iv) 16.

Last Answer : (iii) 14*

Description : 12345678910

Last Answer : this is again a question for 100 mazes, you like him if you do, so why would you run away from him right away?

Description : The total number of bridges on I.R.is about a)1 Lac b)1.25 Lacs* c)1.50 Lacs d)2 Lacs

Last Answer : b)1.25 Lacs*

Description : The amplitude of a wave is ______. (i) the distance the wave moves in one second (ii). the distance the wave moves in one time period of the wave (iii) the maximum distance moved by the medium particles on either side of the mean position* (iv) the distance equal to one wave length

Last Answer : iii) the maximum distance moved by the medium particles on either side of the mean position*

Description : Marking on weld should be done which side? (i) Non gauge face side of A.T. weld * (ii) Gauge face side of A.T. weld (iii) On web of non gauge face side of A.T. weld (iv) On web of gauge face side of A.T. weld

Last Answer : (i) Non gauge face side of A.T. weld

Description : Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above

Last Answer : (i) 10 CM minimum both side of weld & on welded surface .*

Description : How many nos. of sleepers should be loosened either side of the proposed weld? (i) 3 sleepers (ii) 5 sleepers.* (iii) 2 sleepers (iv) 4 sleepers

Last Answer : (ii) 5 sleepers.

Description : Finished tolerance on 10 cm long st. edge at the centre on gauge side shall be? (i) ± 0.4 mm (ii) ± 0.1 mm (iii) ± 0.2 mm (iv) ± 0.3 mm*

Last Answer : iv) ± 0.3 mm*

Description : Finished tolerance on 1 Mt. st. edge at the centre on gauge side shall be? (i) ± 0.2 mm (ii) ± 0.3 mm (iii) ± 0.5 mm* (iv) ± 1.0 mm

Last Answer : (iii) ± 0.5 mm*

Description : The Frog of a brick is normally made on its a) Top face* b) Bottom face c) Longer face d) Shorter side

Last Answer : a) Top face*

Description : Density of each compacted layer should be ascertained by taking soil samples on either side of Central Line at a) 5 meter interval b) 10 meter interval* c) 12 meter interval d) 15 meter internal

Last Answer : b) 10 meter interval*

Description : The side slope of formation in embankment /cutting depends on a) Shearing strength of soil and its angle of repose* b) Angle of repose c) Bearing capacity of the soil d) Optimum moisture content of the soil

Last Answer : a) Shearing strength of soil and its angle of repose*

Description : The side slope of formation in embankment is a) 2 : 1* b) 1: 1 c) 1:5 d) 1:3

Last Answer : a) 2 : 1*

Description : The bottom of side drains should be below the formation level by at least------------ a) 45 cm b )30 cm* c) 15 cm d) 60 cm

Last Answer : b )30 cm*

Description : In case of a curved track on electrified, double line, BG section a) Duty hut cannot be provided for a level crossing. b) Duty hut should be on the inside of the curve. c) Duty hut should be on the outside of the curve.* d) Duty hut can be provided on any side of the curve.

Last Answer : c) Duty hut should be on the outside of the curve.*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Stop boards on either side of approaches of all unmanned level crossings shall be provided at -------------from the centre line of nearest track. a) 3meters b) 5 meters* c) 6 meters d) 10 meters

Last Answer : b) 5 meters*

Description : The date of painting of steel work should be painted in white on the out side of the left girder a) of the 1st span only b) first span only but on all spans for Imp. Bridges* c) of the all spans d) None of the above

Last Answer : b) first span only but on all spans for Imp. Bridges*

Description : Definition of major bridge a) Single span of 12m & above b) Total linear water way more than 18m c) Both a) & b)* d) None of the above

Last Answer : c) Both a) & b)*