The time corresponding to minimum total project cost is
(A) Crash time
(B) Normal time
(C) Optimistic time
(D) Between normal time and crash time

1 Answer

Answer :

(D) Between normal time and crash time

Related questions

Description : The time corresponding to minimum total project cost is  A. crash time B. normal time C. optimistic time D. between normal time and crash time

Last Answer : D. between normal time and crash time

Description : The time corresponding to minimum total project cost is  A. crash time B. normal time C. optimistic time

Last Answer : D. between normal time and crash time

Description : The time with which direct cost does not reduce with the increase in time is known as (A) Crash time (B) Normal time (C) Optimistic time (D) Standard time

Last Answer : (B) Normal time

Description : The time with which direct cost does not reduce with the increase in time is known as  A.crash time B.normal time C.optimistic time D.standard time

Last Answer : B.normal time

Description : Crash project duration is obtained by summing the (A) Normal durations for all the activities (B) Crash durations for all activities (C) Crash durations for all the activities along the ... along the critical path obtained by taking into account the crash duration for all the activities.

Last Answer : (D) Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities.

Description : If variable part of annual cost on account of interest and depreciation on the capital outlay is equal to the annual cost of electrical energy wasted in the conductors, the total annual cost will be minimum and the ... (b) Ohm's law (c) Kirchhoffs law (d) Faraday's law (e) none of the above

Last Answer : (a) Kelvin's law

Description : The time which results in the leasi, possible construction cost of an activity, is known as (A) Normal time (B) Slow time (C) Crash time (D) Standard time

Last Answer : (B) Slow time

Description : Economic height of a dam is the height corresponding to which  (A) Cost of the dam per unit of storage is minimum  (B) Amount of silting is less  (C) Cost of dam per unit storage is maximum  (D) Free board provided is least 

Last Answer : (A) Cost of the dam per unit of storage is minimum 

Description : The direct cost of a project with respect to normal time is (A) minimum (B) Maximum (C) Zero (D) Infinite

Last Answer : (A) minimum

Description : PERT (Project Evaluation and Review Technique) analysis is based on  A. Optimistic time, Pessimistic time and Most likely time  B.Pessimistic time, Optional time, Maximum time  C.Optimistic time, Efficient time, Most likely time  D.Minimax time, Optimistic time and harmonic time

Last Answer : A. Optimistic time, Pessimistic time and Most likely time

Description : When planning a systems project, overly optimistic timetables are the cause of project  completion delays.

Last Answer : Ans: True

Description : You are a project manager for Move It Now trucking company. Your company specializes in moving household goods across the city or across the country. Your project involves upgrading the nationwide computer network for the ... the weighted average or expected value? A. 54 B. 66 C. 60 D. 30

Last Answer : C. 60

Description : 15. The depth of water in a channel corresponding to the minimum specific energy is known as critical depth. A) Agree B) Disagree

Last Answer : A

Description : The discharge in an open channel corresponding to critical depth is (A) Zero (B) Minimum (C) Maximum (D) None of these

Last Answer : Answer: Option C

Description : Minimum number of 50 kg cement bags per cubic metre of concrete for a mix corresponding to crushing strength 280 kg/cm2 at 28 days, are (A) 5.0 (B) 6.5 (C) 7.0 (D) 7.5

Last Answer : Answer: Option B

Description : If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is (A) (a + m + b)/6 (B) (a + 2m + b)/6 (C) (a + 4m + b)/6 (D) (a + 5m + b)/6

Last Answer : (C) (a + 4m + b)/6

Description : The area under the Beta distribution curve is divided into two equal parts by (A) Most likely time (B) Optimistic time (C) Pessimistic time (D) Expected time

Last Answer : (D) Expected time

Description : If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively (A) 3.5 and 5/6 (B) 5 and 25/36 (C) 3.5 and 25/36 (D) 4 and 5/6

Last Answer : (C) 3.5 and 25/36

Description : Pick up the correct statement from the following: (A) Optimistic time estimate refers to activities (B) Pessimistic time estimate refers to activities (C) Most likely time estimate refers to activities (D) All the above

Last Answer : (D) All the above

Description : For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is (A) 8 days (B) 9 days (C) 10 days (D) 15 days

Last Answer : (B) 9 days

Description : In project crashing, as we systematically, crash the project, direct cost of project ______ a. Increases b. Decreases c. Remain same d. None of the above

Last Answer : a. Increases

Description : Normal depth in open channel flow is the depth of flow corresponding to (A) Steady flow (B) Unsteady flow (C) Laminar flow (D) Uniform flow

Last Answer : Answer: Option D

Description : For completion of a project, the critical path of the network represents (A) Minimum time (B) Maximum time (C) Maximum cost (D) Minimum cost

Last Answer : (A) Minimum time

Description : Super normal profits occurs when (a) Average revenue is more than average cost ; (b) Total revenue is maximum; (c) Total cost is minimum ; (d) MC is equal to MR 

Last Answer : (a) Average revenue is more than average cost ;

Description : Minimum porosity for fluidisation is (A) That corresponding to static bed (B) That corresponding to completely fluidised bed (C) The porosity of the bed when true fluidisation begins (D) Less than that of the' static bed

Last Answer : (C) The porosity of the bed when true fluidisation begins

Description : Which among the following is correct about Device Drivers: a) It operate or control a particular type of device that is attached to a computer b) Each device needs at least one corresponding device driver ... computer typically needs more than one device driver d) None of These e) All of the Above

Last Answer : e) All of the Above

Description : How hard do you find it to be realistic and optimistic at the same time?

Last Answer : Being a realist is the practical way to put optimism into action.

Description : How optimistic should we be about the recent HIV vaccine trial?

Last Answer : If it proves safe and effective, that’s wonderful. My heart goes out to those didn’t survive to see this day.

Description : Are you cautiously optimistic that the early voting turnout has been so huge?

Last Answer : I don’t get my hopes up. Too many disappointments in the past 30+ years of voting.

Description : What makes you optimistic for the future?

Last Answer : Only in a general way. I strongly believe that life, in general, is a product of cycles, and that all cycles change over time. I have found this to be true in my life, my happiness, my health, ... stems from my belief that bad things, over time, tend to get better. Or as George Harrison wrote, link

Description : Is there a downside of being a flexible, optimistic person?

Last Answer : The downsides, as I see them, are - People take your optimism and flexibility as naivety and a lack of backbone. Also see Why is enthusiasm often perceived as naivety? - The perception that there's ... to you. Just work on a healthy balance and realize what others see in your outlook and actions.

Description : Assuming the most optimistic scenario, how serious a problem is global warming going to be?

Last Answer : There is not but many will wrongly claim that there is. As far as how serious it will be is a complete unknown. Um . Bad, probably. I'm not even touching the cause here because it's pointless to ... . At least change will happen slowly enough to give us time to adapt. What else is there to say?

Description : Are you pessimistic or optimistic for the economic future of your country?

Last Answer : answer:I agree with David Suzuki that economics is a mental illness. From inside that illness, I think that things may go up or down but that it will eventually get worse and worse, unless/until many things change that are outside the mental box of that illness.

Description : Were you ever Negative Nancy but eventually changed your mindset and are now optimistic?

Last Answer : Actually I used to be what one would consider to be a true optimist, but my life experiences have led to me to support the logic behind this quote A pessimist is an optimist with experience - ... pessimist in the true sense, but I'm just more careful now being a bit older and more experienced.

Description : Do you believe if you have a positive and optimistic outlook, good things will happen to you?

Last Answer : Yes….positive attitude is everything to being happy! At an early age my mom taught me to answer “great!” no matter what when people asked you how you are doing. More often than not thinking you are doing great will help override even the funkiest of funks.

Description : Are humans naturally optimistic or pessimistic?

Last Answer : neither, we are neutral at birth and the effects of life change us to think one way or the other.

Description : Are you optimistic or pessimistic about our future? (Immediate and Long-term)

Last Answer : Well, lloydbird honey, I don't know how much of a future we have since I'm a happily married woman . . . Oh, wait, us? Humanity? I think the future looks bright. While I don't ... the importance of saving our planet and its resources. Fluther gives me hope, especially the posts of the young people.

Description : What situation best describes a difference in interpretation A.One painter's life work shows an optimistic outlook while another painter's life work shows a deeply pessimistic outlook. B.One noveli?

Last Answer : What is the answer ?

Description : What weather conditions would make a climber optimistic?

Last Answer : A sunny but little cold weather could make the mountain climberoptimistic.

Description : Why is the MMF method of estimating the voltage regulation considered as the optimistic method?

Last Answer : In this method the actual value is more than the result obtained.

Description : ) What is the full form of SEO?  A. Search engine optimization  B. Search engine optimistic  C. Search english optimization  D. None of the above

Last Answer : A. Search engine optimization

Description : Point out the wrong statement. a) Taken as a unit, Request => Process => Response is not an atomic transaction b) A coherent transaction either succeeds and is enacted, or ... transaction commitment in a multiuser application, durability requires correcting the condition d) None of the mentioned

Last Answer : Taken as a unit, “Request => Process => Response” is not an atomic transaction

Description : The maximise criteria is ........................... a. Optimistic b. Pessimistic c. Neutral d. None of these

Last Answer : b. Pessimistic

Description : During the construction period, price variation clause in contracts caters to (A) Increase in rates of only important materials (B) Variation in cost in materials element, labour element and petrol-oil-lubricant ... ) Variation in total cost of the project on an ad hoc basis (D) Rate of inflation

Last Answer : (B) Variation in cost in materials element, labour element and petrol-oil-lubricant element

Description : In resources levelling (A) Total duration of project is reduced (B) Total duration of project is increased (C) Uniform demand of resources is achieved (D) Cost of project is controlled

Last Answer : C

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description : Normal depth in open channel flow is the depth of flow in the channel (A) Corresponding to uniform flow (B) Measured normal to the channel bed (C) Corresponding to steady flow (D) None of these

Last Answer : (A) Corresponding to uniform flow

Description : 100% modulation in AM means a corresponding increase in total power by: A. 25% B. 75% C. 100% D. 50%

Last Answer : D. 50%

Description : Dew point of an air-water vapor mixture (A) Decreases with decrease in pressure (B) At constant humidity & total pressure is fixed (C) Corresponding to any point on the humidity chart is obtained by projecting a ... to the temperature axis and to the saturation curve (D) All 'a', 'b' & 'c'

Last Answer : (D) All 'a', 'b' & 'c'