Pick up the correct statement from the following:
(A) Forward pass is used for calculating earliest expected time
(B) Backward pass is used for calculating the latest occurrence time
(C) Maximum value of earliest expected time is used if there is more than one value of any
event
(D) All the above

1 Answer

Answer :

(D) All the above

Related questions

Description : Pick up the correct statement from the following: (A) The difference of latest occurrence time and earliest expected time, is called slack (B) The activities connecting the events having zero slack, lie on the critical path (C) The critical path consumes the maximum time (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) Earliest expected time is denoted by TE (B) Latest occurrence time is denoted by TL (C) Contractual obligation time is denoted by Ts (D) All the above

Last Answer : (D) All the above

Description : Backward pass calculations are done to find ________ occurrence times of events a. Tentative b. Definite c. Latest d. Earliest

Last Answer : c. Latest

Description : Forward pass calculations are done to find _____ occurrence times of events a. Exact b. Earliest c. Latest d. Approximate

Last Answer : b. Earliest

Description : Pick up the correct statement from the following: (A) The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float' (B) ... C) The difference between total float and free float, is called interfering float (D) All the above

Last Answer : (D) All the above

Description : Pick up the incorrect statement from the following: (A) The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the activity (B) The ... start time and earliest start time of an activity, is called total float (D) None of thes

Last Answer : (D) None of these

Description : Select the incorrect statement. (A) Earliest start of an activity is the early event time of the node it leaves. (B) Latest finish of an activity is the late event time of the node it enters. (C) Latest start of an activity is its latest finish minus its duration. (D) None of the above

Last Answer : (D) None of the above

Description : Pick up the incorrect statement from the following: (A) In dog-legged stairs, no space between its flights is provided (B) In open newel stair, a rectangular well is provided (C) In ... forward and backward flights, is provided (D) In geometrical stair, two quarter space landing is provided

Last Answer : Answer: Option D

Description : The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is (A) 19 (B) 14 (C) 24 (D) None of these

Last Answer : (A) 19

Description : At the completion of the forward and backward passes, the slack for an activity is given by the a. Difference between early start and early finish b. Difference between early start and ... c. Difference between latest start and early finish d. Difference between latest start and latest finish

Last Answer : c. Difference between latest start and early finish

Description : Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same Select the correct answer. (A) A is correct but R is not correct (B) R is correct but A is not correct (C) Both A and R is correct (D) Both A and R is incorrect

Last Answer : (A) A is correct but R is not correct

Description :  Once the logic of a network is laid out, the project manager will conduct a forward  pass and a backward pass through the network. This will provide information regarding  ______ and will identify ... C. Resource shortages, high risk activities D. The high risk activities, non-critical path

Last Answer : A. The total duration of the project, critical path

Description : To calculate early start (ES) and early finish (EF) perform a:  A. Backward pass B. Forward pass  C. Lateral pass D. Critical pass

Last Answer : B. Forward pass

Description : )The total amount of risk that is calculated for a project is found by 1. Multiplying the sum of each the risk times the amount at stake 2. Calculating the cumulative sum of the probability for ... 3. Cannot be calculated since all risks are not know  4. The amount of project reserves available

Last Answer : 2. Calculating the cumulative sum of the probability for each risk and multiplying this value times the consequence of occurrence of the risk events

Description : Pick up the correct statement from the following: (A) If the slope of the curve of a mass diagram in the direction of increasing abscissa is downward, it indicates an embankment (B) The ... and the next forward maximum ordinate represents the whole volume of a cutting (D) All the above

Last Answer : (D) All the above

Description : Pick out the correct statement. (A) Higher is the temperature of the radiating body, higher is the wavelength of radiation (B) Logarithmic mean area is used for calculating the heat flow rate ... ) Solid angle subtended by the finite surface at the radiating element is called the angle of incidence

Last Answer : (B) Logarithmic mean area is used for calculating the heat flow rate through a thick walled cylinder

Description : Total float for any activity is defined as the difference between (A) Its latest finish time and earliest start time for its successor activity (B) Its latest start time and earliest start ... earliest finish time (D) Its earliest finish time and earliest start time for its successor activity

Last Answer : (B) Its latest start time and earliest start time

Description : If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good (A) EF = ES + D (B) LS = LF - D (C) LF = LS + D (D) All the above

Last Answer : (D) All the above

Description : Which of the following statements is correct regarding float' for anactivity? a) Time between its earliest start time and earliest finish time b) Time between its latest start time and latest ... start time and earliest finish time d) Time between earliest finish time and latest finish time

Last Answer : d) Time between earliest finish time and latest finish time

Description : The earliest calculating devices are A) Abacus B) Clock C) Difference Engine D) None of these

Last Answer : Answer : A

Description : The earliest calculating device is : a. Calculator b. Abacus c. Difference engine d. Analytical engine

Last Answer : b. Abacus

Description : The earliest calculating device is: a) Diffencial Engine b) Pascal c) Abacus d) Clock e) None of These

Last Answer : c) Abacus

Description : The earliest calculating devices are- 1) Abacus 2) Clock 3) Difference Engine 4) None of these

Last Answer : 1) Abacus

Description : The earliest calculating devices are 1 Abacus 2 Clock 3 Difference Engine 4 None of these

Last Answer : 1 Abacus

Description : Pick out the wrong statement. (A) The value of hydrostatic head increases with increase in vacuum in the effect in a multiple effect evaporator system (B) Entering velocity of the liquid in ... a multiple effect evaporation system, the number of effects is limited by the total boiling point rise

Last Answer : (C) Duhring's plot is used for calculating the concentration of solution

Description : Regarding the working stress design of under reinforced concrete section, (a) The neutral axis depth will be greater than that of a balanced section. (b) The stress in steel intension will reach ... on the tension side is also be considered for calculating the moment of resistance of the section.

Last Answer : both b&c

Description : Pick up the correct statement from the following: (A) The horizontal angle between magnetic meridian and true meridian at a place is called magnetic declination or variance of the compass (B) The ... lines through places at which the declination is zero are termedagonic lines (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) Programme Evaluation and Review Technique, is event oriented (B) Programme Evaluation and Review Technique is not event oriented (C) Critical Path Method is event oriented (D) Critical Path method is event oriented

Last Answer : (A) Programme Evaluation and Review Technique, is event oriented

Description : Free float for any activity is defined as the difference between A. its earliest finish time and earliest start time for its successor activity B. its latest start time and earliest start time ... its successor activity D. its earliest finish time and latest start time for its successor activity

Last Answer : A. its earliest finish time and earliest start time for its successor activity

Description : In a PERT network, the earliest(activity) start time is the a. Earliest time that an activity can be finished without delaying the entire project b. Latest time that an activity can ... of precedence requirements d. Latest time that an activity can be finished without delaying the entire project

Last Answer : c. Earliest time that an activity can be started without violation of precedence requirements

Description : The EST + activity duration = .............................. a. Earliest Finish Time b. Latest Start Time c. Latest Finish Time d. None of these

Last Answer : a. Earliest Finish Time

Description : ..................... is the duration by which an activity can be delayed without delaying the completion of the project. a. Earliest Start Time b. Earliest Finish Time c. Latest Start Time d. Latest Finish Time

Last Answer : c. Latest Start Time

Description : Pick up the correct statement from the following:  (A) The pH value of neutral water is 7  (B) The maximum acidity is obtained when pH value is zero . (C) The maximum alkalinity is obtained when pH value is 14  (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) A maximum value of dry density is obtained at optimum water content (B) At low value of water content most soils tend to be stiff (C) At high water content, the dry density decreases with an increase of water content (D) All the above

Last Answer : Answer: Option D

Description : The rate of forward reaction, at chemical equilibrium is _________the rate of backward reaction. (A) More than (B) Less than (C) Equal to (D) Either (B) or (C)

Last Answer : (C) Equal to

Description : What are the earliest and latest possible dates, on the common Roman calendar, for the Hebrew Festival of Shabuot, the Feast of Weeks, or Pentecost?

Last Answer : It always falls 49 days from the second day of Passover. (7 weeks ). Those 49 days are known as the Counting of the Omer. (The 33rd day - Lag B'omer) is considered a holiday to spend ... Pesach can be anywhere between mid-March and late April. Quick consult a Jewish calendar. The date is variable.

Description : What are your personal guidelines as far as the earliest in the day you'll call someone and the latest in the evening you'll call, if you don't know their sleep/wake habits?

Last Answer : 10am, 9pm.

Description : Why doesn't the summer solstice have the earliest sunrise or latest sunset of the year?

Last Answer : It's supposed to be the longest day of the year, right? What gives?

Description : A backward feed multiple effect evaporator is better than forward feed for concentrating cold feed, because it provides (A) Higher economy (B) Lower capacity (C) Both (A) & (B) (D) Lower economy

Last Answer : (A) Higher economy

Description : Fqra cold viscous feed, backward feed gives __________ than forward feed. (A) A higher capacity (B) A lower capacity (C) Lower economy (D) None of these

Last Answer : (A) A higher capacity

Description : The catalyst in a second order reversible reaction increases the rate of the forward reaction (A) And decreases that of backward reaction (B) And backward reaction equally (C) Only (D) To a greater extent than that of the backward reaction

Last Answer : (B) And backward reaction equally

Description : In a reversible reaction, a catalyst increases the rate of forward reaction (A) Only (B) To a greater extent than that of the backward reaction (C) And decreases that of the backward reaction (D) And the backward reaction equally

Last Answer : (D) And the backward reaction equally

Description : Acquiring one or more suppliers for growth is…. A. Horizontal integration B. Forward integration C. Backward integration D. None of these options

Last Answer : Backward integration

Description : Acquiring one or more suppliers for growth is…. A. Horizontal integration B. Forward integration C. Backward integration D. None of these options

Last Answer : Backward integration

Description : When channel members assume responsibility for one or more of the marketing flows over at least two separate levels of distribution manufacturing and wholesaling, in fact, such systems are synonymous ... vertical marketing systems C. Administered vertical marketing systems D. None of the above

Last Answer : A. Corporate vertical marketing systems

Description : Pick out the wrong statement. (A) The form drag is dependent upon the occurrence of a wake (B) The shear stress at any given cross-section of a pipe for steady flow (either laminar or turbulent ... of viscosity (D) Existence of the boundary layer in fluid flow is because of viscosity of the fluid

Last Answer : (C) An ideal fluid is the one, which has negligible surface tension and obeys the Newton's law of viscosity

Description : The chemical reaction at one time the rate of forward and backward reaction becomes equal that state is called Equilibrium state. In a chemical equilibrium, the following properties remain unchanged with time. Pressure, Temperature, density, color Pressure, Temperature, density, color

Last Answer : Who proposed law of mass action ?

Description : Pick out the wrong statement. (A) In a first order reaction, A → products; the reaction becomes slower as it proceeds, because the concentration of A decreases and the rate is proportional to the concentration ... irreversible reaction, A + B → 2C is k.CA .CB , then the reaction is always elementary

Last Answer : (C) According to the penetration theory, the mass transfer co-efficient decreases, if the exposure time of an eddy to the solute decreases