The time by which a particular activity can be delayed without affecting the preceding and
succeeding activities is known as
(A) Total float
(B) Free float
(C) Interfering float
(D) Independent float

1 Answer

Answer :

(D) Independent float

Related questions

Description : Pick up the correct statement from the following: (A) The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float' (B) ... C) The difference between total float and free float, is called interfering float (D) All the above

Last Answer : (D) All the above

Description : The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as (A) Duration (B) Total float (C) Free float (D) Interfering float

Last Answer : (C) Free float

Description : Free float is mainly used to (A) Identify the activities which can be delayed without affecting the total float of preceding activity (B) Identify the activities, which can be delayed ... which can be delayed without affecting the total float of either the preceding or succeeding activities

Last Answer : (B) Identify the activities, which can be delayed without affecting the total float of succeeding activity

Description : The independent float affects only (A) Preceding activities (B) Succeeding activities (C) The particular activity involved (D) None of the above

Last Answer : (C) The particular activity involved

Description : Independent float is the amount of time by which:  A. Start of the activity can be delayed without affecting the EST of subsequent  activity  B. reduces the float of subsequent ... without affecting EST  D. completion of an activity can be delayed beyond earliest possible finishing time

Last Answer : A. Start of the activity can be delayed without affecting the EST of subsequent  activity

Description : Interfering float is the difference between (A) Total float and free float (B) Total float and independent float (C) Free float and independent float (D) None of the above

Last Answer : (A) Total float and free float

Description : The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as (A) Event (B) Free float (C) Dummy (D) Constrain

Last Answer : (C) Dummy

Description : .......................... is the duration by which an activity can be delayed without delaying the project. a. Slack b. Total float c. Both a and b d. None of these

Last Answer : b. Total float

Description : Whenever an activity has zero total float, then (A) Free float of the activity must be zero but independent float need not be zero (B) Independent float must be zero but free float need not be ... and independent float both must be zero (D) Free float and independent float both need not be zero

Last Answer : (C) Free float and independent float both must be zero

Description : Additional time which a non-critical activity can consume without increasing the project duration is called _____________. A. Total Float. B. Free Float C. Independent Float. D. Dependant Float

Last Answer : A. Total Float.

Description : In a PERT network, slack time is _____. (a) The end point that represents the completion of a major activity (b) The time or resources required to progress from one event to another ( ... without delaying the whole Project (d) The longest or most time-consuming sequence of events and activities 

Last Answer : (c) The amount of time an individual activity can be delayed without delaying the whole Project 

Description : Consider the following statements: In the critical path method of construction planning, Free Float can be. 1. Greater than Total Float. 2. Greater than Independent Float 3. Equal to Total Float. 4. Less than ... (B) 2 and 3 are correct (C) 1 and 4 are correct (D) 1 and 2 are correct

Last Answer : (B) 2 and 3 are correct

Description : The following statements relate to CPE credit units. Which is incorrect? a. One credit hour of CPE program, activity or source shall be equivalent to one (1) credit unit. b. Any excess ... carried over to the next three-year period including credit units earned for doctoral and master's degrees.

Last Answer : Excess credit units earned may be carried over to the next three-year period including credit units earned for doctoral and master's degrees.

Description : Critical path moves along the activities having total float as (a) Positive (b) Negative ( c) Zero (d) Unity

Last Answer : ( c) Zero

Description : Pick up the incorrect statement from the following: (A) The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the activity (B) The ... start time and earliest start time of an activity, is called total float (D) None of thes

Last Answer : (D) None of these

Description : Total float for any activity is defined as the difference between (A) Its latest finish time and earliest start time for its successor activity (B) Its latest start time and earliest start ... earliest finish time (D) Its earliest finish time and earliest start time for its successor activity

Last Answer : (B) Its latest start time and earliest start time

Description : Activities which can be accomplished simultaneously are termed as ___________. A. Preceeding Activities. B. Succeeding Activities. C. Concurrent Activities D. Dummy Activities.

Last Answer : C. Concurrent Activities

Description : Activities which must be finished before a given event can occur are termed as _________. A. Preceeding Activities. B. Succeeding Activities C. Concurrent Activities D. Dummy Activities.

Last Answer : A. Preceeding Activities.

Description : Select the incorrect statement. (A) Start float and finish float are always equal. (B) Total float can be either start float or finish float. (C) Start float and finish float need not be equal. (D) Start float and finish float are the differences between activity times and not event times.

Last Answer : (C) Start float and finish float need not be equal.

Description : An activity whose start or end cannot be delay without affecting total project completion time is called ______ activity a. Dummy b. Non-critical c. Critical d. Important

Last Answer : c. Critical

Description :  In a project schedule, the sequence of activities which cannot be delayed during the  course of the project without extending the project end date is referred to as the:  A. Action plan B. Critical path C. Schedule baseline D. Slack line

Last Answer : B. Critical path

Description : Long-term thiazide therapy can cause hyperglycaemia by: A. Reducing insulin release B. Interfering with glucose utilization in tissues C. Increasing sympathetic activity D. Increasing corticosteroid secretion

Last Answer : A. Reducing insulin release

Description : ..................... is the duration by which an activity can be delayed without delaying the completion of the project. a. Earliest Start Time b. Earliest Finish Time c. Latest Start Time d. Latest Finish Time

Last Answer : c. Latest Start Time

Description : Pick up the correct statement from the following: (A) The tides at any place occur a little less than 1 hour later, each succeeding day (B) The influence of the earth's gravity alone produces level-tidal ... ) The spinning force is maximum at the equator and zero at the poles (D) All of the above

Last Answer : (D) All of the above

Description : Free float for any activity is defined as the difference between A. its earliest finish time and earliest start time for its successor activity B. its latest start time and earliest start time ... its successor activity D. its earliest finish time and latest start time for its successor activity

Last Answer : A. its earliest finish time and earliest start time for its successor activity

Description : Choose the correct option according to given below  statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: quality assurance, ... . c. Only statement 3 is correct. d. Statement 1 and statement 3 are correct

Last Answer : b. Statement 1 and statement 2 are correct.

Description : A transit is oriented by setting its vernier A to read the back azimuth of the preceding line. A back sight on the preceding transit station taken and transit is rotated about its vertical axis. The vernier ... (C) Back bearing of the forward line (D) Equal to 360°-azimuth of the forward line

Last Answer : (A) Azimuth of the forward line

Description : The angle between the prolongation of the preceding line and the forward line of a traverse is called (A) Deflection angle (B) Included angle (C) Direct angle (D) None of the above

Last Answer : (A) Deflection angle

Description : In competitive enzyme activity inhibition (A) The structure of inhibitor generally resembles that of the substrate (B) Inhibitor decreases apparent Km (C) Km remains unaffective (E) Inhibitor decreases Vmax without affecting Km

Last Answer : Answer : A

Description : How do I display two interactive Flash objects in Camino without them interfering with one another?

Last Answer : answer:This sounds like it could be a bug in Camino... you could post at their forum (http://forums.mozillazine.org/viewforum?f=12) or on their bugzilla (http://www.caminobrowser.org/documentation/bugzilla/) ... fix. You might need to link to your source, depending if you want people to work on it.

Description : Unnecessary and frequent applications of varnish to the generator windings to repair defective insulation will result in ____________. A. heavy coatings of varnish interfering with heat dissipation B. ... of the rectifier assembly D. a built-up of varnish without changing generator operation

Last Answer : Answer: A

Description : Suppose an intelligent student became mal-adjusted due to some family problems. As he has deep faith in you, he comes to you for its solution. What action will you take in this condition? ... selfishness by knowing his family's weakness D) You leave the child without interfering in his problem

Last Answer : B) You think patiently and suggest some favourable remedy 

Description : Total float in a planning network is (a) Late start time – Early start time (b) Early start time – Late start time (c) Late start time – Late finish time (d) Late finish time – Early finish time

Last Answer : Ans: (a & d)

Description : The range of a particular Rotameter can be increased by (A) Use of floats of different densities (B) No means (C) Increasing the diameter of the float (D) Decreasing the diameter of the float

Last Answer : (A) Use of floats of different densities

Description : A critical path network diagram does NOT: A. Help determine the amount of float B. Identify the particularly important activities C. Calculate earned value D. Calculate the duration of the whole project

Last Answer : C. Calculate earned value

Description : With Republicans succeeding in making abortion impossible in many red states, will we see a spike in crime in 15 years or so?

Last Answer : With the rise of the internet and so much entertainment I don’t believe so. However, I think they’ll still have their “Honorable, Patriotic” crop of people to have when it comes to military recruiting.

Description : Following and Succeeding at the Perfect Body Diet?

Last Answer : The perfect body diet is a newer one that is aimed towards helping the dieter achieve that perfect body through diet and exercise. There are a few tips for somebody who plans to follow this diet ... loose skin Following these simple tips will help you reach the perfect body you've always dreamed of.

Description : A cropping system where the land is hands over the succeeding crop before the harvest of standing crop.

Last Answer : Ans.Relay or overlapping cropping

Description : The seed of succeeding crops is sown broadcast at 10 to 15 days before harvesting rice crop?

Last Answer : Ans.Paira/Utera Crops

Description : Allelo-chemicals interfere with survival and growth of a).Neighbouring plants b). succeeding plants c). The donor plants themselves d). All

Last Answer : d). All

Description : Which is appropriate description of Average Costs? a) The value of opportunities which have been lost by utilizing resources in particular service or health technology. b) The total costs (i.e. all the ... costs. d) The cost of the consumption of medicines is a good example of variable costs.

Last Answer : b) The total costs (i.e. all the costs incurred in the delivery of a service) of a health care system divided by the units of production. 

Description : The difference between the time avail-to do a job and the time required to do the job, is known as (A) Event (B) Float (C) Duration (D) Constraint

Last Answer : (B) Float

Description : The project schedule is used to determine all of the following except which one?  A. Cost estimates B. Activity start dates C. Float times D. Activity end dates

Last Answer : A. Cost estimates

Description : Which one of the following is not a reason why the users of financial statements desire for an independent assessment of the financial statement presentation? a. Complexity of transactions affecting the ... c. Remoteness of the user from the organization d. All of them are potential reasons

Last Answer : Lack of criteria on which to base information

Description : While solving an assignment problem, an activity is assigned to a resource through a square with zero opportunity cost because the objective is to a. Minimize total cost of assignment b. Reduce the cost of ... to zero c. Reduce the cost of that particular assignment to zero d. All of the above

Last Answer : c. Reduce the cost of that particular assignment to zero

Description : Which of the following statements concerning perioperative nutrition is true concerning the above-described patient? a. Since the patient's weight had been stable with no preoperative nutritional deficit ... feeding catheter should be placed at the time of surgery for postoperative enteral feeding

Last Answer : Answer: a Most patients undergoing elective operations are adequately nourished. Unless the patient has suffered significant preoperative malnutrition, characterized by weight loss greater than ... gastrointestinal surgery, this technique would not appear indicated in the patient described above

Description : While scheduling a project by C.P.M. (A) A project is divided into various activities (B) Required time for each activity is established (C) Net work is drawn by connecting the activities and the events (D) All the above

Last Answer : (D) All the above

Description : Pick up the incorrect statement from the following: (A) The activity is the time consuming part of a project (B) The beginning and end of a job, are called events (C) The activity ... maximum time, is called a node (D) Logically and sequentially connected activities and events form a network

Last Answer : (C) The activity which consumes maximum time, is called a node

Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration

Last Answer : (C) Least cost slope

Description : Choose the correct statement about the action of nitrates on coronary vessels (a) They mitigate angina pectoris by increasing total coronary flow (b) They preferentially dilate conducting ... the larger arteries (d) They increase subepicardial blood flow without affecting subendocardial blood flow

Last Answer : Ans: B